Last Updated 02/12/2020 04:13 AM
Project Title

Preservation - District 6

Physical Address View project details and contacts
City, State (County) (Colleton, Dorchester Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Traffic Control 1.000 Ls Borrow Excavation 362.000 Cy Maintenance Stone 17.750 Ton Liquid Asphalt Binder Pg76-22 433.244 Ton Full Depth Asph. Pav. Patching 6" Unif. 1,775.000 Sy Milling Existing Asphalt Pavement (Variable) 14,820.000 Sy Milled-In Rumble Strip 5.630 Mi Hot Mix Asphalt Surface Course Type d 1,445.500 Ton Hot Mix Asphalt Surface Course Type e 5,200.612 Ton Driveway Paving-Surface Type d 65.625 Ton Permanent Construction Signs (Ground Mounted) 1,720.000 Sf 4" White Broken Lines(Gaps Excl.)Perm.Pvmt.Marking 3,094.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Perm.Pvmt.Marking 39,230.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Perm.Pvmt.Marking 36.000 Lf White Single Arrows (Lt, Strght, Rt) Perm.Pvmt.Marking 9.000 Ea White Word Message "Only" -Perm.Pvmt.Marking 7.000 Ea 4" Yellow Broken Lines(Gaps Exc)Perm.Pvmt.Marking 1,840.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Perm.Pvmt.Marking 37,352.000 Lf 8" Yellow Solid Lines(Pvt.Edge Lines) Perm.Pvmt.Marking 85.000 Lf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 6,248.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 104,120.000 Lf 8"White Solid Lines(Crosswalk&Channelization)Fast Dry Paint 85.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 180.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 18.000 Ea White Word Message "Only"-Fast Dry Paint 14.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 6,360.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 71,404.000 Lf 6"Yel Solid Lines On 6"Conc.Curb(Top&Side)-Fast Dry Pnt 1,000.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 150.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 872.000 Ea Removal Of Pavement Markings 30.000 Lf Removal Of All Pavement Markings 11.900 Lm 4" White Broken Lines- (Gaps Excld) - Single Component Hybridized Polymer– 20 Mils 30.000 Lf 4" White Solid Lines-(Pavement Edge Lines)-Single Component Hybridized Polymer–20 Mils 12,830.000 Lf 24" White Solid Lines-(Stop/Diagonal Lines)-Single Component Hybridized Polymer–20 Mils 54.000 Lf 4" Yellow Broken Lines (Gaps Excluded) - Single Component Hybridized Polymer - 20 Mils 1,340.000 Lf 4" Yellow Solid Lines (Pavement Edge & No Passing Zone) - Single Component Hybridized Polymer - 20 Mils 3,630.000 Lf Furnish & Install 1.0" Schedule 80 Pvc Conduit 20.000 Lf Furnish & Instl No. 14 Copper Wire,1-Conductor For Loop Wire 600.000 Lf Sawcut For Loop Detector 300.000 Lf

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents