Project Title | New Pumphouse Power Upgrade Installation at Belleayre Ski Center |
Physical Address | View project details and contacts |
City, State (County) | Highmount, NY 12441 (Ulster County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work for Single Prime Contract” for a general description and the Technical Specification Sections for the specific descriptions; but in a general overview of the contract scope includes: Install two (2) 6” conduits from Switchgear 01 to New Upper Pumphouse location - approximately 3200 feet. Pull three (3) 4/0 cables and (1) 2/0 ground through one (1) of the conduits; other conduit shall be terminated at future transformer location and capped for future use. Install two (2) 4 circuit sectionalizers and vaults. Install three (3) vaults for the three (3) 2000KVA transformers. Install the transformers onto the vaults. Connect one sectionalizer to existing 4/0 cables that currently feed existing 2500KVA transformer. Connect existing 2500KVA transformer to sectionalizer and connect one of the new 2000KVA transformers to the other circuit in the sectionalizer. Connect new feed to the second sectionalizer and terminate the other two (2) 2000KVA transformers to the second sectionalizer. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |