Similar Projects
2019 Bond - Clay County School District
New Construction, Renovation, Infrastructure
Conception
$318,000,000 CJ est. value
Orange Park, FL 32073

New Elementary School "R"
New Construction - 105,000 SF
Design
$22,547,665 est. value
FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

First Coast Expressway (SR 23) from East of CR 16A Spur to East of CR 209
Infrastructure
Post-Bid
$401,758,196 est. value
Orange Park, FL

CR 218 - Cosmos Avenue to Pine Tree Lane Design Build
Results
FL

Construction Management at Risk Services (CMAR) for the Bonded Transportation Program (BTP) Group #2 Projects
Results
Green Cove Springs, Middleburg, FL 32043

Tynes Elementary School - New Classroom Addition
Addition - 12,917 SF
Construction
$2,530,000 est. value
Middleburg, FL 32068

Clay County School District - New Spring Park Elementary School
New Construction
Post-Bid
Green Cove Springs, FL 32043

Continuous Asphalt Resurfacing, Paving and Supplies
Results
Green Cove Springs, FL

SR 25 (US 41 / US 441) from I-75 (SR 93) to CR 252
Infrastructure
Post-Bid
$9,805,526 est. value

Dolphin Street and Dolphin Court Utility Roadway Improvements
Results
$1,100,000 to $1,150,000 est. value
Orange Park, FL 32073

Contract Services for Electrical Construction - Countywide
Term Contract
Post-Bid
$200,000 CJ est. value
Green Cove Springs, FL 32043

CR 209-36 from CR315B to Henley Road Shoulder and Safety Improvements
Results
FL

Community Development Block Grant (CDBG) Cattail Street Dirt Road Paving
Infrastructure
Post-Bid
$700,000 est. value
Middleburg, FL 32068

Construction Management at Risk Services for the Bonded Transportation Program (BTP) Group 1 Projects
Infrastructure
Results
FL

Last Updated 08/16/2022 03:03 PM
Project Title

Construction of New School - A - Clay County School District

Physical Address View project details and contacts
City, State (County) Orange Park, FL 32073   (Clay County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids
Project Status Obtained from a credible source, Awaiting verification, Construction start expected August 2024
Bids Due View project details and contacts
Estimated Value $22,393,036 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

More exact scope of work, location and timeline will be released at a later date. As of August 16, 2022, this project is in the conceptual phase. An architect has been selected for the project. A firm construction timeline has not been released. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents