Similar Projects
New Jail Construction
New Construction
Conception
$32,000,000 est. value
Ironton, OH

Regional Jail Expansion
Addition
Conception
OH

Mansfield & Richland Correctional Institution Renovations
Renovation
Design
$11,430,000 est. value
Mansfield, OH

Harrison County Jail
New Construction
Design
$15,000,000 est. value
Cadiz, OH

Ohio Penal Industries (OPI) Central Distribution Center Renovation Project
Renovation
Bidding
$6,200,000 CJ est. value
London, OH 43140

RFQ CM at Risk - PCI New Housing and Foodservice
New Construction, Infrastructure
Bidding
$64,500,000 CJ est. value
Orient, OH 43146

RFQ Design - Cuyahoga County Corrections Center Project
Renovation
Post-Bid
$5,000,000 CJ est. value
Cleveland, OH 44113

Wood County Jail Expansion and Renovation for Detention Equipment and Secured Electronics
Renovation
Post-Bid
$19,806,750 est. value
Bowling Green, OH 43402

OPI Glove Manufacturing Facility
New Construction
Results
$3,000,000 est. value
London, OH 43140

Gallipolis Developmental Center (GDC) AT Building HVAC and Roof Replacement
Renovation
Results
$4,284,900 CJ est. value
Gallipolis, OH 45631

RFQ Design - Marion Correctional Institution (MCI) General Renovations
Renovation
Pending Verification
$7,300,000 CJ est. value
Marion, OH 43302

Scioto County Jail Expansion
Addition
Pending Verification
Portsmouth, OH 45662

New Jail
New Construction
Conception
$50,000,000 est. value
OH

RFQ D/B - STW Mobile Generator Docking Stations - Phase 2
Renovation
Bidding
$3,580,000 CJ est. value
Dayton, OH 45402

RFP Construction Manager at Risk - Building Renovations and Expansion
Addition, Demolition, Renovation, Infrastructure - 131,000 SF
Post-Bid
$45,000,000 CJ est. value
Columbus, OH 43230

Last Updated 11/10/2022 01:41 PM
Project Title

River Program Building - State of Ohio Department of Youth Service

Physical Address View project details and contacts
City, State (County) Massillon, OH 44646   (Stark County)
Category(s) Government/Public
Sub-Category(s) Prison/Jail
Contracting Method Competitive Bids
Project Status Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $6,800,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call to S expand IRJCF’s youth program by adding a new stand-alone facility for Behavioral Health Services (BHS), volunteer program and a chapel for multi-denominational services. The intended location for the new building will be within proximity of the existing gymnasium/outdoor basketball courts along the facilities’ front entry perimeter fence. As of November 10, 2022, the design firm has been selected. Further details regarding design and construction timelines have not been identified. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents