Similar Projects
Preventative Maintenance & Repair of Commercial Kitchen Exhaust Systems
Term Contract
Post-Bid

HVAC & Refrigeration Replacement & Maintenance For Lukoil Service Stations
Alteration
Post-Bid

HVAC Evaluation
Alteration
Results
Ewing Township, NJ 08618

Roof Replacement & HVAC Rehabilitation
Alteration
Results
$555,000 est. value
Ewing Township, NJ 08618

HVAC & Refrigeration Replacement & Maintenance - NJ, NY & PA / Project # 44-21
Term Contract
Post-Bid
New York, NY

HVAC Upgrades at Various Schools
Alteration
Results
Princeton, NJ

HVAC Equipment
Alteration
Post-Bid
Trenton, NJ

ASB HVAC Equipment Booster Transformers
Alteration
Results
Ewing, NJ

Vacant Unit Reconditioning
Alteration
Post-Bid
Trenton, NJ

Installation of a HVAC Water Treatment System
Alteration
Results
East Windsor, NJ 08520

Robbins Elementary School HVAC Improvements
Alteration
Post-Bid
Trenton, NJ 08609

New Ventilation System
Alteration
Results
$103,421 est. value
Ewing Township, NJ 08628

HVAC Maintenance at Trenton Water Works Distribution Complex
Term Contract
Post-Bid
Trenton, NJ 08638

HVAC Upgrades to Langtree and Morgan Elementary Schools
Alteration
Results
Hamilton Township, Trenton, NJ 08690

HVAC - All Regions
Term Contract
Post-Bid

Last Updated 12/21/2022 12:07 PM
Project Title

HVAC Upgrades Phase 2 at the Existing Various Schools

Physical Address View project details and contacts
City, State (County) East Windsor, NJ 08520   (Mercer County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $7,113,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of HVAC Upgrades at three (3) schools. Melvin H. Kreps MS: The removal of nine (9) air handler units and the decommissioning of the existing chiller. Nine (9) rooftop packaged units will be installed, all supply and return diffusers are to be replaced, new rooftop gas piping and electrical conduit. Grace N. Rogers ES: The removal of seventeen (17) unit ventilators, four (4) rooftop packaged units, and ceiling and lighting removal in select rooms. Patching of exterior walls where unit ventilators were removed, new ceilings and light fixtures in select rooms, new mechanical ductwork, new supply and return diffusers, four (4) new RTUs replaced in kind on adaptor curbs or new curbs, and six (6) new rooftop packaged units on new steel dunnage. Walter C. Black ES: The removal of twelve (12) unit ventilators and ceiling and lighting removal in select rooms. Patching of exterior walls where unit ventilators were removed, new ceilings and light fixtures in select rooms, new mechanical ductwork, new supply and return diffusers, and five (5) new rooftop packaged units on new steel dunnage.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents