Similar Projects
CR 1840 / Brown Bridge Road at CR 13 / Magnet Road
Infrastructure
Design
$1,000,000 CJ est. value
Covington, GA 30014

CR 1840 / Brown Bridge Road at CR 13 / Magnet Road
Infrastructure
Design
$1,000,000 CJ est. value
Covington, GA 30014

Milling, Plant Mix Resurfacing and Shoulder Rehabilitation on SR 81
Infrastructure
Bidding
$1,000,000 CJ est. value
Covington, GA 30016

Milling, Plant Mix Resurfacing and Shoulder Rehabilitation on SR 81
Infrastructure
Bidding
$1,000,000 CJ est. value
Covington, GA 30016

Electric Utility Right-Of-Way Clearing
Term Contract
Post-Bid
Covington, GA

Rocket Carwash / Covington
New Construction, Infrastructure - 3,740 SF
Post-Bid
$848,980 CJ est. value
Covington, GA 30014

Replacement Eastside High School Roundabout And R-Cut Accesses
Results
Covington, Oxford, GA

LMIG Road Resurfacing
Infrastructure
Results
$1,963,100 est. value
Covington, GA

Panda Express #3536
New Construction - 2,422 SF
Construction
$1,800,000 est. value
Covington, GA 30014

Alcovy Road Multi-Residential Development
New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Covington, GA 30014

Clark Street Multi-Residential Development
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Covington, GA 30014

SR 212 at Lake Jackson 13.9 Mi S of Covington
Demolition, New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Covington, GA 30016

Lead and Copper Replacement Program and Backflow Inventory
Infrastructure
Bidding
$200,000 CJ est. value
Covington, GA 30014

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

5.650 Miles of Milling, Plant Mix Resurfacing and Shoulder Rehabilitation on SR 212 Beginning East of Ashley DR and Extending East to Covered Bridge Road
Infrastructure
Results
Covington, GA 30016

Last Updated 01/27/2023 09:41 AM
Project Title

Rhinehart's Oyster Bar / Covington

Physical Address View project details and contacts
City, State (County) Covington, GA 30014   (Newton County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Sub-Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Negotiating General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

*The owner requests that all subcontractor / supplier inquiries be directed to the Negotiated General Contractor.

Details

2 Stories Above Grade, 9,235 SF. Parking Spaces, 83 Parking Spaces.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents