Similar Projects
Thro Replace HVAC Systems for Painted Canyon VC
Term Contract
Design
Medora, ND

Condensing Unit Replacement
Alteration
Bidding
$300,000 est. value
Dickinson, ND 58601

EERC Replacement Steam Coil with Hot Water Coil
Alteration
Bidding
$50,000 est. value
Grand Forks, ND

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

Minot AFB Computer Room Air Conditioning (CRAC) Unit Removal
Results
Minot Air Force Base, ND

Cooling Tower Replacement at VFW Sports Center Rink 2
Results
Bismarck, ND 58501

Jack Science Center Chiller Line Replacement
Post-Bid
Bismarck, ND 58501

HVAC Improvements
Results
Minot, ND 58701

Red River High School HVAC - Phase II
Post-Bid
Grand Forks, ND 58201

Fargo Sub Service, Repair, Replace A/C Condensing Unit and Evaporator
Term Contract
Results
West Fargo, ND 58078

Life Skills & Transition Center Cooling Tower Replacement
Renovation
Post-Bid
Grafton, ND 58237

Job Service North Dakota HVAC Maintenance Agreement
Term Contract
Results

HVAC Improvements
Post-Bid
ND

Replace HVAC Units in Park Housing
Term Contract
Results
$25,000 to $100,000 est. value
Medora, ND 58645

Reported 06/02/2022 12:00 AM
Project Title

HVAC Improvements for 2001 High Service Pump Station

Physical Address View project details and contacts
City, State (County) Grand Forks, ND   (Grand Forks County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $60,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and discard existing air handling unit (AHU) which includes a condensing unit, dual duct furnace, and required existing ductwork, louvers and louver operators. Install two separate roof top units (RTUs) - one for the MCC room and one for the High Service Pump Room to provide heating and cooling for each room and to allow each space to operate independently. Anticipated 25 ton overall system capacity but may change based on contractor's system design and concept. Verify existing precast double tee roof load bearing capacity to accommodate any proposed roof penetrations and weight of proposed RTUs and related roof-mounted equipment and peripherals.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents