Similar Projects
Mill and Overlay - CSAH 9 (Woodland Avenue) - CP 0009-382898
Infrastructure
Conception
$800,000 est. value
Duluth, MN 55802

Bridge Construction - CSAH 49 - CP 0049-494726 - Saint Louis County
New Construction, Infrastructure
Conception
$400,000 est. value
Kelsey, MN 55724

Mill and Overlay
Infrastructure
Design
$2,500,000 CJ est. value
Duluth, MN 55808

Mill and Overlay
Infrastructure
Design
$2,500,000 CJ est. value
Duluth, MN 55808

Giants Ridge Valve House
New Construction, Infrastructure
Bidding
$400,000 CJ est. value
Biwabik, MN 55708

Road and Street Concrete
Infrastructure
Bidding
$400,000 CJ est. value
Duluth, MN 55802

Scientific Drilling Operations
Infrastructure
Post-Bid
Soudan, MN 55782

Scientific Drilling Operations for 2022
Infrastructure
Post-Bid
Soudan, MN 55782

Grading and Bituminous Surfacing
Results
MN

Grading, Bituminous Surfacing, Utilities and ADA Improvements
Results
MN

Hangar 101 Demolition and Development - Phase 1
Demolition, Renovation, Infrastructure
Construction
$388,236 CJ est. value
Duluth, MN 55811

Public Works Campus - St. Louis County
New Construction, Infrastructure
Construction
$8,000,000 CJ est. value
Tower, MN 55790

Planet Fitness / Duluth
New Construction, Infrastructure - 22,300 SF
Pending Verification
$2,500,000 CJ est. value
Duluth, MN 55811

Planet Fitness / Duluth
New Construction, Infrastructure - 22,300 SF
Pending Verification
$2,500,000 CJ est. value
Duluth, MN 55811

Bridge Construction - CSAH 7 (Industrial Road) - CP 0007-494517
New Construction, Infrastructure
Conception
$400,000 est. value
Duluth, MN 55802

Last Updated 12/13/2022 04:23 PM
Project Title

Construct Bridge 69A78 (County Bridge 777) and Approaches

Physical Address View project details and contacts
City, State (County) Buyck, MN 55771   (Saint Louis County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $974,530 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of 12/13/2022 Bid awarded in the amount of $974,529.50 Questions regarding this Project, including any questions prior to bidding shall be directed to Rachel Gregg, Bridge Engineer, at 218-262-0174 or greggr@stlouiscountymn.gov Bridge construction project on TWP 7992 (Johnson Rd), crossing Pelican River, and 1.5 miles SE of Orr, MN. New bridge to be constructed adjacent to the existing bridge structure in order to utilize the existing bridge as a bypass road during construction. Construction Start Date:07/10/2023 Construction End Date:10/28/2023 TYPE OF WORK: Construct Bridge 69A78 (County Bridge 777) and Approaches

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents