Similar Projects
US 19/SR 595 - Roundabout
Infrastructure
Bidding
$2,019,100 est. value
FL

2021 Asphalt Patching Services
Post-Bid
Saint Pete Beach, FL

Imagine Clearwater Park (Buildings, Hardscape, Landscape and Other Site Improvements)
New Construction
Post-Bid
$65,000,000 est. value
Clearwater, FL 34621

Construction Manager at Risk with Guaranteed Maximum Price for 22nd Street South Corridor Improvements
Results
Saint Petersburg, FL 33713

2021 Roadway Resurfacing Project
Results
Less than $2,000,000 est. value
Clearwater, FL

Z2PZ--Construction for Paving of the Gravel Parking Lots at the St. Petersburg, FL. Regional Office
Post-Bid
$1,000,000 to $2,000,000 est. value
Saint Petersburg, FL

Roadways and Public Rights-of-Way Minor Improvements
Results
Saint Petersburg, FL 33731

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Mango Street Stormwater and Roadway Improvements
Results
$869,000 est. value
Tarpon Springs, FL 34688

East Bay Drive - Turn Lane Improvements
Alteration
Post-Bid
Largo, FL 33779

Asphalt Rejuvenating Agent on Various Street Locations
Results
Less than $60,000 est. value
Dunedin, FL 34697

Ralph Richards Tower Root Grinding and Asphalt Repairs
Infrastructure
Post-Bid
Clearwater, FL 33756

Jail Perimeter Road Modification into Ditch Behind F-Wing
Results
Less than $1,165,522 est. value
Clearwater, FL 33762

Parking Lot Resurfacing- Pinellas County
Term Contract
Post-Bid
Largo, FL 33771

49th Street and 38th Avenue North Intersection Improvements
Results
Less than $1,051,945 est. value
Clearwater, FL 33710

Last Updated 03/03/2022 07:38 AM
Project Title

Tarpon Avenue to South Huey To U.S. Hwy 19 Roadway Improvements

Physical Address View project details and contacts
City, State (County) Tarpon Springs, FL   (Pinellas County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $2,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of rehabilitation of roadway surface between Tarpon Avenue, South Huey Avenue and U.S. HWY 19. PROJECT LENGTH AND MILE POST LIMITS: Tarpon Avenue from S Huey Avenue to US Hwy 19; 0.237 Ml; MP 0.760 to MP 0.997 Project Description: Construction and construction engineering inspection (CEI) for operational improvements along Tarpon Avenue. Mill and resurface of Tarpon Avenue from S Huey to US Hwy 19 and provide pavement markings for improved lane drop conditions. Mill and resurface of Tarpon Avenue including traffic separator work, redistribution of the lanes, signing and pavement markings, ADA upgrades, driveway construction and signal work at the Walmart entrance. MP. 0.000 to MP 0.125

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents