Similar Projects
Upgrade Cleveland/Ashley Water Treatment Plant - 2023-706 - City of Pittsfield
Infrastructure
Conception
$50,000,000 CJ est. value
Pittsfield, MA 01201

RFP Design - Design of a New Administration Building at Waste Water Treatment Building
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Westfield, MA 01085

Massachusetts Water Resources Authority Clarifier Rehabilitation
Renovation, Infrastructure
Bidding
$140,700,000 CJ est. value
Winthrop, MA 02152

Influent Process, Secondary Treatment, and Control Building Upgrades Rebid - General Bid
Renovation, Infrastructure
Bidding
$2,000,000 CJ est. value
Hull, MA 02045

Transport and Disposal of Thickened Sludge and Grit for the Yarmouth Septage Treatment Facility
Term Contract
Sub-Bidding
$450,000 CJ est. value
Yarmouth Port, MA 02675

Annual Material Contracts
Term Contract
Sub-Bidding
Holden, MA 01520

Capital Improvements and Long Term O and M
Post-Bid
Lynn, MA

Prison Point CSO Facility Improvements - Filed Sub-Bids
Post-Bid
Less than $42,500,000 est. value
Boston, MA

Wastewater Treatment Facility Upgrades - Filed Sub-Bids
Results
Less than $12,975,000 est. value
Orange, MA 01364

Wastewater Treatment Facility Upgrades - General Bids
Results
Less than $12,975,000 est. value
Orange, MA 01364

Downtown Area Wastewater Treatment Facility (WWTF) and Effluent Disposal - General Bid
Construction
$22,000,000 est. value
Orleans, MA 02653

Princeton Residential Poet Installation Project
Renovation, Infrastructure
Bidding
$120,000 CJ est. value
Princeton, MA 01541

Lowell Regional Water Utilitys Treatment Facility
Renovation
Sub-Bidding
$225,000 CJ est. value
Lowell, MA 01851

MCI Norfolk - Wastewater Plant Replacement - Filed Sub Bids
Renovation
Post-Bid
$9,905,000 est. value
Norfolk, MA

Prison Point CSO Facility Improvements - General Bids
Results
Less than $42,500,000 est. value
Boston, MA

Last Updated 08/16/2022 07:04 PM
Project Title

Chelsea Creek Headworks Microwave Link #2 to Chelsea Main

Physical Address View project details and contacts
City, State (County) Chelsea, MA 02150   (Suffolk County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $269,750 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing & install. of radio equipment at the CCHW and the Chelsea Tower Equipment Building at 2 Griffin Way in order to establish a radio communications link between the CCHW & Chelsea Main Office. Chelsea Creek Headworks Microwave Link #2 to Chelsea Main. Contractor Category: Electrical or Telecommunication Systems. The Work of this Contract is located at the Chelsea main office facility at 2 Griffin Way in Chelsea and the Chelsea Creek Headworks at 340 Marginal Street in Chelsea. Question Deadline: 06/09/2022 4:00 PM

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents