Similar Projects
Filter Upgrades and Media Replacement at the Globe Hollow Water Treatment Plant
Bidding
$350,000 est. value
Manchester, CT 06040

Finished Water Reservoir Improvements at the Lake Gaillard and West River Water Treatment Plants
Results
Woodbridge, CT

Water Pollution Control Facility SBR No. 4 Air Diffuser Upgrades
Renovation
Results
$350,000 est. value
Uncasville, CT 06382

West River Water Treatment Plant Improvements Project
Renovation
Bidding
New Haven, CT

Design-Build Services for New State Road Water Treatment Facility Upgrades
Results
Manchester, CT 06042

Potassium Permanganate Chemical Feed System Improvements at Lake Gaillard WTP
Results
North Branford, CT 06471

F103--Sources Sought Chemical Water Treatment
Results
West Haven, CT

Second Clarifier No. 5 - 8 Launder Replacement
Post-Bid
Waterbury, CT

Filter Media Replacement
Post-Bid
Danbury, CT

WPC Freight Elevator Rehabilitation
Renovation
Results
Waterbury, CT 06708

Northwest Science Quad Supplemental Utility Plant
New Construction - 40,000 SF
Construction
$50,000,000 est. value
Storrs, CT 06268

Renovation Of The Pump House
Renovation
Construction
Hartford, CT 06106

Last Updated 06/23/2021 04:09 PM
Project Title

Replacement of Internal Equipment for Sedimentation Basins 5,6 and 7 at the Windham Water Works Water Treatment Facility

Physical Address View project details and contacts
City, State (County) Mansfield Center, CT 06250   (Tolland County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work encompasses the furnishing of all labor, materials, equipment and supervision for the removal and disposal of existing internal equipment for Sedimentation Basins 5, 6 and 7 and providing and installing new internal equipment for a complete 3-shaft system with a unit gear drive, including replacement parts for the sludge collection and removal system such as shafts, sprockets, chains, flight scraper systems, brackets, stainless steel fasteners and associated connecting parts, electrical equipment, providing and installing new external motors and motor unit enclosures, and appurtenant work.

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents