Similar Projects
Other Intersection Improvement
Infrastructure
Design
$585,000 CJ est. value
Goshen, IN 46528

Other Intersection Improvement
Infrastructure
Design
$585,000 CJ est. value
Goshen, IN 46528

Road Rehabilitation
Infrastructure
Bidding
$2,330,400 CJ est. value
Nappanee, IN 46550

Road Rehabilitation
Infrastructure
Bidding
$2,330,400 CJ est. value
Nappanee, IN 46550

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Elkhart Riverwalk Boardwalk
Infrastructure
Post-Bid
Elkhart, IN

Abandoned Coal Mine Restoration
Results
$150,000 est. value

County Road 4 Improvements
Results
Goshen, IN

Dollar General / Goshen
New Construction, Infrastructure - 10,640 SF
Pending Verification
$400,000 CJ est. value
Goshen, IN 46526

Rehabilitate Runway - City of Elkhart
Infrastructure
Design
$250,000 est. value
Elkhart, IN 46514

Road Reconstruction - CR 40
Infrastructure
Bidding
$1,201,448 CJ est. value
Goshen, IN 46526

2021-1 Community Crossing Resurfacing
Infrastructure
Post-Bid
Millersburg, IN

2021 Community Crossings Matching Grant Street Improvements
Infrastructure
Results
$34,478,350 est. value
Nappanee, IN

Bike / Pedestrian Facilities
Infrastructure
Design
$2,878,765 CJ est. value
Goshen, IN 46528

CR 38 - CR 35 to SR 13 Improvement Project
Infrastructure
Bidding
$600,000 CJ est. value
Goshen, IN 46526

Last Updated 11/11/2022 10:33 PM
Project Title

South Main Street Streetscape Improvements Phase 3 Lusher Street to Indiana Avenue

Physical Address View project details and contacts
City, State (County) Elkhart, IN 46517   (Elkhart County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $570,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project Summary: Remove and replace sidewalks and approaches, remove and replace curb ramps, place pavement markings for pedestrian crossings, and install new pedestrian lighting between Lusher Street and Indiana Avenue. Any bid received after the Deadline, will be returned to the bidder unopened. After opening the bids, the Board will take all bids under advisement and refer them to City staff for review and tabulation. Bids must be submitted on State Board of Accounts 2013 REVISED BID FORM 96. A certified check or bank draft drawn on a solvent bank in the State of Indiana, payable without condition to the City of Elkhart, or a satisfactory bid bond executed by bidder and surety company in an amount not less than five (5) percent of the bid, shall be submitted with each bid. Any deviation from the bid documents must be explained by bidder. The Board will award a contract to the lowest responsive and responsible bidder. The Board reserves the right to waive informalities or irregularities, and to reject any and all bids or portions thereof.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents