Similar Projects
Spring Hill Industrial Buildings 2 & 3
New Construction - 231,999 SF
Design
Spring Hill, TN

Construction of a TDOT Salt Bin at 370 Rock Milam Road in Cedar Grove
New Construction
Bidding
TN

Home Star Self Storage - Shell
New Construction - 41,944 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Memphis, TN 38122

Pole Barn - 40' X 84' Building
Post-Bid
Dunlap, TN 37327

Pole Barn at "Boneyard" for MBWWTP
Results
Less than $192,500 est. value
Chattanooga, TN 37405

Greenway Farms New Conference Facility
Results
Less than $1,727,600 est. value
Chattanooga, TN 37402

Woods Air Movement to Establish North American Headquarters
New Construction - 25,000 SF
Construction
Less than $3,600,000 est. value
Murfreesboro, TN

Amazon Fulfillment Center
New Construction - 635,000 SF
Pending Verification
$200,000,000 est. value
Alcoa, TN 37701

Amazon Warehouse
New Construction - 455,378 SF
Pending Verification
$39,894,098 est. value
Nashville, TN 37204

Platinum Storage Bellevue
New Construction - 71,291 SF
Post-Bid
Nashville, TN 37221

Portable Storage Buildings
Results
TN

Verizon Wireless Industrial Building
Addition - 18,608 SF
Pending Verification
Arlington, TN 38002

East End Utility Buildings
New Construction, Renovation - 20,000 SF
Post-Bid
Savannah, TN 38372

Pole Barn
New Construction - 4,200 SF
Results
Lexington, TN

Amazon
New Construction - 219,000 SF
Pending Verification
$30,000,000 to $40,000,000 est. value
Knoxville, TN 37924

Reported 02/10/2022 12:00 AM
Project Title

Steel Frame Metal Building

Physical Address View project details and contacts
City, State (County) TN   (Dickson County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

3,600 Square Foot Steel Frame Metal Building. This will be utilized for Dickson County Emergency Management Agency and a Fire Station.

Details

Warehouse/Storage, 3,600 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents