Similar Projects
Tremont Fountain Improvements
Bidding
Upper Arlington, OH 43221

Multiple Building Chiller Replacements
Post-Bid
Less than $1,200,000 est. value
Columbus, OH

Boiler Controls
Post-Bid
Columbus, OH

Domestic Water Heater Replacement
Results
Reynoldsburg, OH

J--Cooling Towers - Refurbish/Repair
Results
Columbus, OH 43219

Boiler Repair Service
Post-Bid
Columbus, OH

DEV-Emergency Repair
Results
Columbus, OH

FCBDD 2021 ECLC Boilers Replacement
Post-Bid
$115,000 est. value
Columbus, OH 43214

Boiler Replacement
Results
$2,140,197 est. value
Columbus, OH

DOW OPS - 2.5 Gallon Electric Water Heaters
Post-Bid
Columbus, OH

Project CSC-20082 Overhaul AFD on Existing Chillers, Building 23 at DSCC in Columbus, OH, FH 20
Results
Columbus, OH 43218

Fawcett - Boiler Replacement
Results
Less than $572,700 est. value
Columbus, OH

RPAC-Heating Hot Water Renovation
Results
Less than $662,000 est. value
Columbus, OH

Boiler Replacement at North High School
Results
Less than $669,200 est. value
Westerville, OH 43081

Boiler Inspections New Buildings
Results
Columbus, OH

Reported 03/11/2021 12:00 AM
Project Title

Water Meter Back Flow Preventer

Physical Address View project details and contacts
City, State (County) Columbus, OH   (Franklin County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value Less than $1,380,000
Plans Available from Plan Center
Owner View project details and contacts
Architect View project details and contacts
Description

DOMESTIC STEEL USE IS REQUIRED PER ORC 153.011

Details

Division 05 - Metals.
Division 33 - Utilities, Water Utility Distribution Equipment, Water Service Connections, Water Supply Backflow Preventer Assemblies, Water Utility Metering.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents