Similar Projects
Last Updated | 10/12/2022 11:45 PM |
Project Title | Monticello Drive Reconstruction Phase 1 and Phase 2 |
Physical Address | View project details and contacts |
City, State (County) | Waxahachie, TX 75165 (Ellis County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $3,973,000 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of the reconstruction of approximately 2,600 linear feet of Monticello Drive from Cumberland Road to Richmond Lane. This includes reconstructing the existing asphalt roadway to a concrete section consisting of 6" of reinforced concrete with 6" of flexible base subgrade. The project also includes the installation of approximately 3,000 LF of 6"-8" water line, 1,800 LF of reinforced concrete pipe and reinforced concrete box culverts of various sizes, and approximately 3,000 LF of 6"-10" sanitary sewer line. Additionally, the project includes ADA compliant sidewalks with curb ramps, driveway repairs, and streetlights. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |