Similar Projects
Last Updated | 10/07/2020 04:02 PM |
Project Title | Cook`s Lake Operation and Maintenance |
Physical Address | View project details and contacts |
City, State (County) | Glendale, AZ (Maricopa County) |
Category(s) | Single Trades |
Sub-Category(s) | Fencing |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The applicant will inspect the perimeter fence line, on foot, once a month from November to March (midmonth) and twice a month (at 2 week intervals) from April to October. Interior fences do not need to be inspected at the same frequency as the perimeter fence; but shall be inspected and repaired as necessary to maintain the integrity of the fence. The trail through the property shall be inspected and cleared in April and October each year unless otherwise requested. The fence lines shall be cleared annually in November. Deviation from all identified time lines must be authorized by the COR. The contractor shall be responsible for repairs to, or replacement of, approximately 13,512 feet of wildlife friendly four stranded smooth and barb wire fence on the south, east and west portion of the property, and approximately 1850 feet of 3-rail pipe fence and an associated cattle trap on the north side (Appendix B). |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |