Similar Projects
Old Town Hall Historic Wooden Window Replacement - FAC-6 - Town of Andover
Alteration
Conception
Andover, MA 01810

Bernardston Highway Garage Doors Project
Renovation
Design
$140,000 CJ est. value
Bernardston, MA 01337

Entry Doors and Trim Replacement at Annapolis Development
Renovation
Sub-Bidding
$392,548 CJ est. value
Boston, MA 02125

Construction of a Concrete Island at the Mayor Bill Carpenter Parking Garage
New Construction, Infrastructure
Sub-Bidding
$100,000 CJ est. value
Brockton, MA 02301

Overhead Door Repair Services
Alteration
Post-Bid
$100,000 est. value
Boston, MA

Building Glass Repair Services
Alteration
Post-Bid
$100,000 est. value
Boston, MA

Overhead Doors
Alteration
Results
$35,000 est. value
Chelsea, MA

Phase 5 Envelope Repairs/Window and Door Replacement
Alteration
Results
$266,908 est. value
Hanson, MA

Exterior Doors Replacement Project
Renovation
Construction
$22,000 CJ est. value
Boston, MA 02135

Hernandez School-Storage Partition Walls & door
Renovation
Construction
$44,495 CJ est. value
Boston, MA 02119

Interior Painting Improvements and Rear Exterior Entry Doors
Renovation
Sub-Bidding
$41,000 CJ est. value
Attleboro, MA 02703

Community Building Automatic Door
Alteration
Post-Bid
$11,000 est. value
Carver, MA

Window Replacement at Pittsfield Fire Department - Engine 1 Station
Alteration
Results
$70,000 est. value
Pittsfield, MA 01201

Septage Oxidation Ditch Door Replacements
Renovation
Construction
$54,100 CJ est. value
S Yarmouth, MA 02664

Window Replacement
Renovation
Sub-Bidding
$99,671 CJ est. value
N Dartmouth, MA 02747

Last Updated 09/20/2023 12:35 PM
Project Title

Window Replacement Project Phase 3

Physical Address View project details and contacts
City, State (County) East Longmeadow, MA 01028   (Hampden County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $155,000 [brand] Estimate
Plans Available from Architect - 09/06/23
Owner View project details and contacts
Architect View project details and contacts
Description

Window Replacement Phase 3 at the Quarry Hill Elderly Housing 667-3. Replace double hung and casement windows with new vinyl DH windows at buildings 1, 2, and Comm Bldg Bidders requiring clarification or interpretation of the Contract Documents shall make a written request to the Architect Question Deadline 09/15/2023 The work under the Contract consists of: 1. Project scope applicable to buildings 1, 2, and community building only (see site plan for building locations). All other buildings are not part of this contract. 2. All existing windows to be demolished down to the window frame (as shown on detail sheets). This includes hardware and tracking for sashes. 3. For bedroom windows, existing windows to be demolished entirely down to studs (rough opening), where noted on Window Schedule. This in accordance with the International Existing Building Code (IEBC) Chapter 7 Section 702.5. 4. Note that building elevations shown are existing window conditions. All existing windows are to be replaced with double hung windows, unless noted otherwise (see Window Schedule). 5. Bidders are reminded that not every detail of construction can be shown on the drawings and that not every part of every assembly can be listed in the specifications. The owner assumes that bidders are experienced tradesman who estimate and supply all the required materials for their trades as having visited the site prior to bidding. 6. Protect all existing finishes to remain during construction. Contractor is responsible for repairing any and all existing finishes damaged during construction to the owner and architect's satisfaction. 7. All contractors are to field verify all existing conditions and dimensions prior to bidding. Any discrepancies are to be reported to the architect immediately. 8. Patch to match all existing finishes affected by this project, including but not limited to: existing finishes to remain (siding, masonry, gypsum wallboard, trim, etc.); existing landscaping; existing paving. 9. Provide and install new triple glazed argon filled (R-4.8) vinyl windows as shown. See window schedule for type. 10. Provide and install air conditioner sill supports (manufactured by same manufacturer as windows). Contractor responsible for removing, storing, and reinstalling all existing window air conditioners in new windows. 11. Demolish all existing vinyl shutters where present. See elevations for locations and field verify current conditions. 12. Remove and reinstall all existing interior window coverings. Types, styles, and installation methods may vary by unit. 13. All Work either shown on the drawings or included in the specifications unless specifically indicated as not to be done.

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents