Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

SR 4057 over Brush Run
Infrastructure
Design
$1,432,216 CJ est. value
Blaine Township, PA 15312

$160M LRD Metal Fabrication, Refurbishment, and Installation Multiple Award Task Order Contracts (MATOCS)
Renovation
Design
$5,000,000 to $20,000,000 est. value

Marlboro Drive Storm Sewer Improvements
Infrastructure
Bidding
$300,000 CJ est. value
McMurray, PA 15317

Playground Improvements at the Allison Park Elementary School
Infrastructure
Bidding
$60,000 CJ est. value
Houston, PA 15342

Multiple Award Indefinite Quantity/Indefinite Delivery (IDIQ) Contract with Design/Build Capabilities for Central and Western Pennsylvania
New Construction
Post-Bid
$2,500 to $6,000,000 est. value

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

JOC Order Contracting Region A
Results
$10,000,000 est. value

D/B Northeast MATOC
Results
$1,000,000 to $250,000,000 est. value

Abandoned Mine Reclamation (AMR) Monongahela South No. 1 - Phase 2
Infrastructure
Construction
$493,352 CJ est. value
Monongahela, PA 15063

REBID - GENERAL TRADES AND PLUMBING CONTRACTS - NORTH FRANKLIN TOWNSHIP - PROPOSED MUNICIPAL BUILDING
New Construction, Infrastructure
Construction
$3,078,200 CJ est. value
Washington, PA 15301

PA 88 SB - Charleroi CMAQ
Infrastructure
Conception
$3,380,400 CJ est. value
Finleyville, PA 15332

SR 4022 over Bridge Buffalo Creek
Demolition, New Construction, Infrastructure
Design
$1,285,712 CJ est. value
Washington, PA 15301

Public Works Toilet & Locker Rooms Renovations
Renovation
Bidding
$400,000 CJ est. value
Venetia, PA 15367

Last Updated 01/24/2023 09:35 AM
Project Title

New Storage Building and Improve Maintenance Facility - Phase 3

Physical Address View project details and contacts
City, State (County) Eighty Four, PA 15330   (Washington County)
Category(s) Government/Public, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $5,197,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 24, 2023, this project has not yet been awarded. A timeline for award has not yet been established. Washington County Maintenance Facility - New Storage Building & Improve Maintenance Facility ESTIMATED RANGE: .1 General - $4,000,000 - $5,000,000 .2 HVAC - Under $100,000 .3 Plumbing - $100,000 - $200,000 & .4 Electrical - $1,000,000 - $2,000,000 LIQUIDATED DAMAGES = (.1) $1,250.00 per day, (.2) $60.00 per day, (.3) $100.00 per day & (.4) $100.00 per day. There is no Bid Guaranty required for this Project. Client Agency Requirements - Park in top parking, enter office building through main entrance. The Department of General Services Public Works and the Bureau of Diversity, Inclusion and Small Business Opportunities (BDISBO) identified this procurement as eligible for the setting of Small Diverse Business (SDB) and/or Veteran Business Enterprise (VBE) participation goals. However, BDISBO did not set SDB and/or VBE participation goals for those procurements that are less than the $400,000 threshold required to set either goal. In addition, there will be no points allocated toward SDB/SB participation for this procurement. This is a significant programmatic change from the SDB and SB Participation program contained in prior Projects issued by Public Works. Bidders now must agree to meet the SDB and VBE Participation Goals in full or demonstrate that they have made Good Faith Efforts to meet the Goals. Refer to the Instructions to Bidders section regarding Small Diverse Business and Veteran Business Enterprise Participation for further information. The Goals for each Prime Contract is as follows: SDB AND VBE GOALS .1 General Construction - ALL BASE BIDS (#1, #2, #3 & #4) SDB = 7% VBE = 3% .2 HVAC Construction - ALL BASE BIDS (#1, #2, #3 & #4) SDB = NA VBE = NA .3 Plumbing Construction - ALL BASE BIDS (#1, #2, #3 & #4) SDB = NA VBE = NA .4 Electrical Construction ALL BASE BIDS (#1, #2, #3 & #4) SDB = NA VBE = NA *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PROJECT NO. DGS C-0251-0037 PHASE 003 D.G.S. 251-37 PHASE 3 Project includes a 2,674 square foot metal building for use by the PennDOT maintenance and operations crew. The project also includes increased parking areas, perimeter site fence, and retaining wall construction; renovations to the existing buildings include correcting floor slopes with a cementitious topping material, electrical upgrades to the security system and access controls, additional doors, and additional plumbing fixtures.

Details

1 Story Above Grade, 2,674 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents