Similar Projects
Finish Site Plan Work for New Marina Office
New Construction, Infrastructure
Conception
$116,643 CJ est. value
Islamorada, FL 33036

Lower Keys Scattered Sites
New Construction, Infrastructure
Design
Big Pine Key, Summerland Key, FL 33043

Sands SLR Roadway and Drainage Pilot Project Big Pine Key
Infrastructure
Bidding
$400,000 CJ est. value
Big Pine Key, FL 33043

Sands SLR Roadway and Drainage Pilot Project Big Pine Key
Infrastructure
Bidding
$400,000 CJ est. value
Big Pine Key, FL 33043

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Whitehead and Front Street Improvements
Results
$2,107,477 est. value
Key West, FL 33040

Koehn and Big Pine Shores Roadway Improvements Project
Infrastructure
Results
Key West, FL

Sea Breeze Mobile Home and RV Park
New Construction, Build-Out - 25,974 SF
Construction
$1,000,000 est. value
Islamorada, FL 33036

New Beacon Pole and Relocate Existing Beacon
Infrastructure
Bidding
$100,000 CJ est. value
Key West Nas, FL 33040

Distribution System Upgrade - No Name Key Asphalt Roadway Restoration
Infrastructure
Post-Bid
Key West, FL

Strategic Resource Evaluation Study - Highway Construction Materials
Infrastructure
Results

Trumbo Road - Stone Road Access Project
Infrastructure
Bidding
$300,000 CJ est. value
Key West Nas, FL 33040

Asphalt Repairs for Duck Key Wastewater Lateral Installs
Infrastructure
Post-Bid
Key West, FL

Southard Street Milling and Resurfacing
Infrastructure
Results
Key West, FL 33040

Last Updated 08/25/2022 08:33 PM
Project Title

City of Key West Wastewater Force Main Asphalt Roadway Restoration Key West, Florida

Physical Address View project details and contacts
City, State (County) Key West Nas, FL 33040   (Monroe County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed project consists of approximately 840 linear feet of pavement restoration. The work includes but not limited to 2.5-inch in depth milling (including disposal) and installation of Type S-I asphalt overlay, where indicated on the plans. This includes multiple mobilization (if required), labor, materials, equipment required to match existing pavement and to construct new Type S-I asphaltic surface overlay with tack coat, including: adjust any valve boxes (where needed), rims, and inlets, or other fixtures to final grade, transition to existing pavement, tack coating, compaction, rolling, brooming and any other work required. All of which shall be constructed in accordance with the Drawings and Specifications. The working includes but is not limited to furnishing and installing all permanent pavement markings, bike lane markings and stop conditions and reflective pavement markers that are to replace the pavement markings based on the pavement replacement work. This includes all stop conditions, and all pavement markings shall be thermal plastic. Proposals must be accompanied by, a certified check, or cashier's check drawn on any State or National Bank, or a bid bond issued by a Surety authorized to issue such bonds in the State where the work is located, in the amount of 5 percent of the total amount of the proposal submitted. This bid security shall be given as a guarantee that the Bidder will execute the attached Contract and furnish properly executed Performance and Payment Bonds, each in the full amount of the Contract price within the time specified. The successful Bidder shall file with the FKAA separate Performance Bond and Payment Bonds on the forms included herewith, each in the full amount of the Contract price in accordance with the requirements of Florida Statutes Section 255.05, as security for the faithful performance of the Contract and the payment of all persons supplying labor and materials for the construction of the work, and to cover all guarantees against defective workmanship or materials, or both, for a period of one (1) year after the date of final acceptance of the work by the FKAA, except that materials supplied by the FKAA shall not be covered by the Payment Bond. The Contract, if awarded, will be awarded to the responsive and responsible bidder submitting the lowest single lump sum/unit cost price proposal, with consideration of any Alternate(s) accepted by the FKAA. Before a Contract will be awarded for the work contemplated herein, the FKAA will conduct such investigation as is necessary to determine the performance record and ability of the apparent low bidder to perform the size and type of work specified under this Contract. Upon request, the Bidder shall submit such information as deemed necessary by the FKAA to evaluate the Bidder's qualifications. Firms are hereby placed on formal notice that neither the FKAA Board of Directors, nor any employees of the FKAA are to be lobbied either individually or collectively concerning this project. The FKAA reserves the right to reject all Proposals where the FKAA deems rejection to be in its best interest, or to reject any Proposal not in compliance with the Contract Documents. The FKAA reserves the right to waive any informalities and irregularities in said repose.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents