Similar Projects
Last Updated | 04/22/2022 09:48 AM |
Project Title | MCCO Weigh Station Static/WIM/Lighting |
Physical Address | View project details and contacts |
City, State (County) | FL (Escambia County) |
Category(s) | Single Trades |
Sub-Category(s) | Security/Communications |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $2,761,085 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The improvements under this contract consist of, but are not limited to, concrete (sidewalk and driveways), and lighting (conduit, pull/splice, conductors, load center, distribution system, standard pole, special pole) at weigh stations (MP 2.763 to MP 3.986) along State Road 8 (I-10) in Escambia County Section 0001 Roadway 0101- 1- Mobilization (44531325216) Ls 1.000 0102- 1- Maintenance of Traffic (44531325216) Ls 1.000 0102- 60- Work Zone Sign Ed 1,800.000 0102- 74- 1 Channelizing Device- Types I, Ii, Di, Vp, Drum, or Lcd Ed 7,200.000 0102- 99- Portable Changeable Message Sign, Temporary Ed 180.000 0102-115- Type Iii Barricade Ed 360.000 0104- 10- 3 Sediment Barrier Lf 7,632.000 0104- 18- Inlet Protection System Ea 6.000 0107- 1- Litter Removal Ac 332.330 0107- 2- Mowing Ac 252.860 0110- 1- 1 Clearing & Grubbing (44531325216) Ls 1.000 0110- 4- 10 Removal of Existing Concrete Sy 427.000 0160- 4- Type B Stabilization Sy 1,168.000 0285-703- Optional Base, Base Group 03 Sy 1,168.000 0334- 1- 15 Superpave Asphaltic Conc, Traffic E Tn 96.000 0522- 1- Concrete Sidewalk and Driveways, 4" Thick Sy 14.000 0999- 25- Initial Contingency Amount, Do Not Bid (44531325216) Ls 1.000 Section 0002 Lighting 0630- 2- 11 Conduit, Furnish & Install, Open Trench Lf 22,017.000 0630- 2- 12 Conduit, Furnish & Install, Directional Bore Lf 878.000 0635- 2- 11 Pull & Splice Box, F&i, 13" X 24" Cover Size Ea 115.000 0635- 2- 12 Pull & Splice Box, F&i, 24" X 36" Cover Size Ea 6.000 0715- 1- 12 Lighting Conductors, F&i, Insulated, No.8 - 6 Lf 109,751.000 0715- 1- 60 Lighting Conductors, Remove & Dispose, Contractor Owns Lf 100,302.000 0715- 4- 13 Light Pole Complete, Furnish & Install Standard Pole Standard Foundation, 40' Mounting Height Ea 99.000 0715- 4- 70 Light Pole Complete, Remove Pole and Foundation Ea 88.000 0715- 5- 51 Luminaire & Bracket Arm, Remove Luminaire and Arm; Pole Remains Ea 6.000 0715- 7- 11 Load Center, F&i, Secondary Voltage Ea 2.000 0715- 7- 41 Load Center, Remove, Secondary Voltage Ea 2.000 0715-500- 1 Pole Cable Distribution System, Furnish and Install, Conventional Ea 106.000 0715-512-140 Light Pole Complete- Special Design, F&i, Double Arm Shoulder Mount, Aluminum, 40' Ea 5.000 0715-518-140 Light Pole Comp- Special Design, F&i, Double Arm, Pole Top Mount, Aluminum, 40' Ea 2.000 |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |