Similar Projects
Reported | 08/18/2020 12:00 AM |
Project Title | S201--Window Washing Services |
Physical Address | View project details and contacts |
City, State (County) | Bedford, MA 01730 (Middlesex County) |
Category(s) | Single Trades |
Sub-Category(s) | Service/Term Contracts |
Contracting Method | Competitive Bids. |
Project Status | Accepting Letters of Interest |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | SPECIFICATIONS: Removing and cleaning screens Cleaning windows (inside and out) Cleaning frames, sills, and sashes (inside and out) Replacing screens after cleaning note some screens are screwed in and tools will be required to remove and replace them. All cleaning tasks shall be accomplished to meet all standards as follows: Remove all paint, dirt, soil and other substances that may be found on the windows. Screens removed for cleaning must be replaced and securely fastened. Some screens may be attached by screws that will require tools to remove. All damages caused by contractor s personnel will be repaired to previously existing condition at contractor s expense. Contractor must follow OSHA guidelines, policies, procedures and directives, as well as fire and safety regulations of the medical center. Work of the contractor is to be coordinated to prevent conflicts with the treatment of patients and the functioning of the facility. No medical apparatus will be moved without approval. The contractor personnel must report to EMS prior to beginning work for each day and shall report back to EMS what they accomplished during the day before leaving the Medical Center grounds. . Contractor personnel must wear identifying clothing, such as caps or shirts with contractor logo while on Medical Center grounds. Contract project manager to submit to EMS, the plan for how areas/rooms are to be serviced each workday. Contracting is required to re-clean where deficiencies have been noted at no additional expense to the Government. (punch list with Chief of EMS.) Re-cleaning is to be accomplished within five (5) working days of identification. Re-cleaning is required until the deficiency has been corrected. Payment will be withheld unit all areas are cleaned to the satisfaction of the VA. All work is to be performed in accordance with the guidelines established by Federal, State and Local ordinances and with contractor s procedures manual and quality control manual. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |