Last Updated 01/13/2021 04:25 AM
Project Title

Reconstruction/Rehabilitation - Florence County

Physical Address View project details and contacts
City, State (County) SC   (Florence County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Traffic Control 1.000 Ls Railroad Insurance And Flagging 001 1.000 Ls Removal & Disposal Of Existing Pavement 9,280.000 Sy Removal & Disposal Of Existing Curb 2,690.000 Lf Borrow Excavation 1,085.200 Cy Excavation For Shoulder Paving 318.176 Sta Hauling Of Excavated Shoulder Material 318.176 Sta Cement Modified Recycled Base (12" Unif)-Curing Method b 40,914.000 Sy Portland Cement For Cement Modified Recycled Base Course 1,475.000 Ton Maintenance Stone 161.700 Ton Hma Shoulder Widening Course 1,773.520 Ton Liquid Asphalt Binder Pg64-22 1,478.766 Ton Full Depth Asph. Pav. Patching 8" Unif 5,000.000 Sy Full Depth Asph. Pav. Patching 10"Unif 11,170.000 Sy Milling Existing Asphalt Pavement 2.0" 181,683.000 Sy Milling Existing Asphalt Pavement (Variable) 4,425.000 Sy Milled-In Rumble Strip 8.060 Mi Hot Mix Asphalt Surface Course Type b 23,795.561 Ton Hot Mix Asphalt Surface Course Type c 1,093.983 Ton Hot Mix Asphalt Surface Course Type d 415.000 Ton Driveway Paving-Surface Type d 559.375 Ton Full Depth Concrete Pavement Patch - 10" 3,800.000 Sy Diamond Grinding Of Concrete Pavement 7,500.000 Sy Clean & Seal Longitudinal Joints 3,700.000 Lf Clean & Seal Trans. Joints 1,665.000 Lf Permanent Construction Signs (Ground Mounted) 4,194.000 Sf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 48,510.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 190,424.000 Lf 8"White Solid Lines(Crosswalk&Channelization)Fast Dry Paint 7,420.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 4,150.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 223.000 Ea White Word Message "Only"-Fast Dry Paint 166.000 Ea White Combination Arrow(Str.& Rt.Or Str.& Lt.)Fast Dry Paint 26.000 Ea Railroad Crossing Symbols - Fast Dry Paint 6.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 15,725.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 310,230.000 Lf 6" Yellow Solid Line On Curb/Median - Fast Dry Paint 495.000 Lf 24" Yellow Diagonal Lines - Fast Dry Paint 465.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Epoxy Paint 6,800.000 Lf 24"White Solid Lines(Stop Lines/Diag.Lines) Epoxy Paint 40.000 Lf 4" Yellow Broken Lines(Gaps Exc) Epoxy Paint 340.000 Lf 4"Yellow Solid Lines-Pvt.Edge&No Passing Zone - Epoxy Paint 3,660.000 Lf 4" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 16,170.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 59,772.000 Lf 8" White Solid Lines Thermoplastic - 125 Mil. 2,520.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Thermo.-125 Mil 1,430.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 75.000 Ea White Word Message "Only" -Thermoplastic - 125 Mil. 56.000 Ea White Combination Arrows(Str&Rt.Or Str&Lt)Thermo-125mil 10.000 Ea Railroad Crossing Symbols - Thermoplastic - 125 Mil. 2.000 Ea 4" Yellow Broken Lines(Gaps Exc)Thermoplastic - 90 Mil. 5,065.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Thermo-90 Mil. 102,105.000 Lf 24" Yellow Solid Lines - Thermoplastic - 125 Mil. 155.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 805.000 Ea Permanent Yellow Pavement Markers Mono-Dir.- 4"x 4" Perm. Yel. 185.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 1,120.000 Ea Removal Of Pavement Markings 33,920.000 Lf Furnish & Install 2.0" Schedule 80 Pvc Conduit 1,775.000 Lf Furnish & Instl No. 14 Copper Wire,1-Conductor For Loop Wire 13,291.000 Lf Sawcut For Loop Detector 5,268.000 Lf f&i-13"x24"x18"d.Elec.Flush Undgrd.Enclos-(Str.Poly.Conc.)Hd 14.000 Ea Catch Basin t-17 (Convert c.b. Type 5) 73.000 Ea Catch Basin t-18 (Convert c.b. Type 7) 25.000 Ea Concrete Curb And Gutter(1`-6") Vertical Face 560.000 Lf Concrete Curb And Gutter(2`-0") Vertical Face 960.000 Lf Concrete Curb And Gutter (3`-0") Vertical Face 1,170.000 Lf Concrete Sidewalk(4" Uniform) 1,950.000 Sy Detectable Warning Material 1,750.000 Sf Concrete Driveway(6" Uniform) 3,830.000 Sy Pedestrian Ramp Construction 3,500.000 Sy Permanent Grassing For Non-Permitted Resurfacing Projects 4.904 Acre

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents