Last Updated | 06/05/2023 01:24 PM |
Project Title | Lee High 4 Roof Sections Replacement |
Physical Address | View project details and contacts |
City, State (County) | Wyoming, MI 49509 (Kent County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $196,960 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of April 17, 2023, this project has not yet been awarded. The project is expected to be awarded on April 18, 2023. Power vacuum and dispose of the ballast gravel from the roof. Remove, properly dispose of existing EPDM membrane. Mechanically attach on layer of 1.5" polyisocyanurate (ISO) insulation board with a 20# density. Fully adhere a new 80-mil Thermoplastic roof system complete with flashings and accessories. Remove existing edge metal. Install new coping metal manufactured from 24-gauge steel. Color to be determined by owner's representative. Lee Middle/High (Sections 4, 5, and 18 Roof Survey) 1. Power vacuum and dispose of the ballast gravel from the roof. 2. Remove, properly dispose of existing EPDM membrane. 3. Mechanically attach on layer of 1.5" polyisocyanurate (ISO) insulation board with a 20# density. 4. Fully adhere a new 80-mil Thermoplastic roof system complete with flashings and accessorie 5. Tall wall details: A. Cut back EPDM and adhere the TPO wall flashing to the wall 12" up from roof deck. B. Seal the top of the TPO using extruded aluminum termination bar. Drape the EPDM over the termination bar. C. All large EPDM walls to be covered with metal siding by others. 6. Remove existing edge metal. Install new coping metal manufactured from 24-gauge steel. Color to be determined by owner's representative. 7. Furnish a manufacturer's 30-year warranty on all materials and workmanship Question Deadline 03/30/2023 Interested bidders shall contact Scott Bergman at 616-241-1140 or sberqman@godfrev-lee.org with any questions regarding bid requirements. All questions will be shared with all bidders. No questions will be accepted after deadline A bid bond is required.(5%) The School District reserves the right to increase or decrease quantities or modify conditions and specifications by mutual agreement with the selected supplier, both at the time of acceptance of this bid as so modified and subsequent thereto. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |