Similar Projects
Wansford Yard Lift Station - Phase 1
New Construction
Bidding
$20,384,600 est. value
Evansville, IN

Mccormick's Creek State Park Sewer System Improvements - Division A - Sanitary System Regionalization
New Construction, Infrastructure
Bidding
Spencer, IN 47460

Sewer Construction Material
Term Contract
Post-Bid
Fort Wayne, IN

Cass Street Bottleneck Removal
Post-Bid
Peru, IN

Sanitary Sewer Extension at the Shelbyville AASF/Readiness Center
Results
Shelbyville, IN 46176

Collection System Improvements
Results
New Palestine, IN 46163

Stallings Booster Station Replacement
Renovation
Bidding
$2,000,000 est. value
Evansville, IN

Underground Facility Locating Services
Term Contract
Post-Bid
Anderson, IN 46011

Golfview Pump Station Replacement
Results
Jeffersonville, IN 47129

Cascaded Jr/Sr HS New Lift Station and Forcemain
Addition
Bidding
Clayton, IN 46118

CSO 1 Elimination
Post-Bid
Kokomo, IN 46901

SR8 and CR19 Sanitary Sewer Extension
Results
Garrett, IN

2022 Sewer and Manhole Rehabilitation
Infrastructure
Bidding
Indianapolis, IN

Truesdell Lift Station and Sewer Extension
Post-Bid
La Porte, IN 46350

Hessen Cassel Storm and Sidewalk Improvements
Results
Fort Wayne, IN 46800

Last Updated 03/29/2022 09:18 AM
Project Title

Sanitary Sewer Improvements, Upper Jacobs and Oakdale Pump Stations and Forcemain

Physical Address View project details and contacts
City, State (County) Monticello, IN   (Carroll County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sanitary Sewer Improvements, Upper Jacobs and Oakdale Pump Stations and Force main project, consisting of upgrades to two existing pump stations and approximately 3,700 LF of 6” HDPE forcemain installed via horizontal directional drill; together with all related civil/site, sanitary/process, structural, mechanical, electrical, instrumentation & control work

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents