Similar Projects
Braum's Ice Cream & Dairy Store
New Construction - 5,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Abilene, TX 79606

Abilene Group Real Estate Offices
New Construction - 2,932 SF
Design
$400,000 est. value
Abilene, TX 79606

Braum's Ice Cream & Dairy Store
New Construction - 5,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Abilene, TX 79603

Modular and Pre Engineered Buildings
Post-Bid
Abilene, TX

Abilene High and Cooper High Fine Arts Renovations
Renovation
Post-Bid
$4,600,000 est. value
Abilene, TX 79605

Taco Bueno
Renovation - 2,100 SF
Construction
Abilene, TX 79605

Cactus III Office Building
New Construction - 8,000 SF
Construction
$900,000 est. value
Abilene, TX 79606

Abilene Christian University Moody Coliseum
Renovation - 102,797 SF
Pending Verification
$39,000,000 est. value
Abilene, TX 79603

Braum's Ice Cream & Dairy Store
New Construction - 5,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Abilene, TX 79601

Jack C. Hays HS - Bleachers
Renovation
Post-Bid

Chick-fil-A
Renovation - 1,850 SF
Construction
Abilene, TX 79601

The South End Addition
New Construction
Design
Abilene, TX

Taco Bell
Renovation - 2,500 SF
Post-Bid
$175,000 est. value
Abilene, TX

Quality Implement Company
New Construction - 32,940 SF
Construction
$4,000,000 est. value
Abilene, TX 79602

New Jim Ned ISD Fine Arts Facility
New Construction
Design
$7,808,967 est. value
Tuscola, TX

Reported 03/11/2022 12:00 AM
Project Title

New Jim Ned ISD Intermediate School

Physical Address View project details and contacts
City, State (County) Tuscola, TX   (Taylor County)
Category(s) Commercial, Education, Entertainment/Recreation
Sub-Category(s) Athletic Facility, Food/Beverage Service, Library - School, Middle/Senior High School, Office
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value $15,830,250
Plans Available from Construction Manager as Contractor (CMc)
Owner View project details and contacts
Architect View project details and contacts
Description

New 69,970 sf Ground Up Intermediate School including: Library, Classroom Hubs, STEM, Music, Art, Administration, Full Kitchen, Cafeteria, Competition Gym, Stage, Playground.

Details

Middle/Senior High School, 69,970 SF New Construction.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Clearing and Grubbing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents