Similar Projects
Relief Wells at Wood River Levee District - USACE St. Louis
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Wood River, IL 62095

Well 3 Pumping Unit
Infrastructure
Bidding
Saint Charles, IL 60174

Well No. 7 Final Production Well Drilling
Infrastructure
Bidding
Loves Park, IL

Submersible Explosion Proof Pumps
Post-Bid
Wheaton, IL 60187

Replacement OEM Moyno Pump Parts
Term Contract
Post-Bid
Waukegan, IL 60085

Phase 2 Installation of Monitoring Wells and Probes
Renovation
Results
Hanover Park, IL 60133

Northwest Waterworks Booster Pump VFD Installation and South Operations Center Pump VFD Replacement
Results
Naperville, IL 60540

Water Supply Well No. 4 Abandonment
Infrastructure
Bidding
Mount Prospect, IL

Pumping Equipment Repair and Maintenance Services
Term Contract
Post-Bid
Naperville, IL 60540

Improvements to City Well Number 31
Results
Naperville, IL 60540

Engineering, Design, and Construction Services for New Deep Well #19
Post-Bid
Crystal Lake, IL

Barrington HS Sewage Ejector Pump Replacement
Results
Barrington, IL 60010

2021 Water Facilities Waste Pump Inspection and Repair
Post-Bid
Carpentersville, IL 60110

Well and Well House No. 3
Results
Less than $1,602,700 est. value
Pecatonica, IL 61063

East Stl Bp 12 Phase 1 Relief Wells
Post-Bid
$10,000,000 to $15,000,000 est. value
Madison, IL

Last Updated 07/28/2021 06:02 PM
Project Title

Test Well for Future Gravel Pack Well 6

Physical Address View project details and contacts
City, State (County) Galesburg, IL   (Knox County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide services and construction of a test well to identify a new potential source for additional water supply for the City of Galesburg, Illinois. Furnishing all labor, materials, and equipment necessary to install a test well on the City’s property located immediately west of the water treatment plant on the west side of IL Route 164 approximately 1 mile south of Oquawka, Illinois. The test well work will consist of drilling and developing the well, installing screens, installing gravel pack, installing casing pipe, grouting and sealing as necessary to protect the water aquifer below ground, yield and pump testing, providing a well driller log and related well construction data, obtaining water samples representative of the aquifer and obtaining water quality analysis, and sealing the test well off to prevent future contamination. The location of the test well will become the location of the permanent well should the information obtained from the test well confirm this location as capable of meeting the project goals.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents