Similar Projects
West Air Cargo Apron Reconstruction
Infrastructure
Conception
$8,000,000 est. value
Phoenix, AZ

Phoenix Goodyear Airport Construct New Apron and Taxiway Connector
Infrastructure
Design
$7,102,620 est. value
Goodyear, AZ 85338

Pinal Airpark Airfield Improvements Phase I
Infrastructure
Bidding
Marana, AZ 85653

Deer Valley Airport Precision Approach Path Indicator System Upgrade - Design-Bid- Build Services
Infrastructure
Bidding
Phoenix, AZ

Rehabilitate Runway 01/19 Rehabilitate Taxiway Connectors A1, A2, & A3
Alteration
Post-Bid
Parker, AZ

General Apron Rehabilitation
Alteration
Post-Bid
$2,000,000 to $2,500,000 est. value
Yuma, AZ

Taxiway C Rehabilitation
Results
$775,000 to $975,000 est. value
Chandler, AZ

162nd Wing - Apron Shoulder Repair
Results
Tucson, AZ 85706

Runway 8-26 Rehabilitation
Infrastructure
Bidding
$200,000 est. value
Safford, AZ 85546

Taxiway W Rehabilitation
Infrastructure
Post-Bid
Phoenix, AZ

Apron and Taxiway J Rehabilitation Project
Results
Sierra Vista, AZ

22037H Safford Regional Airport Runway 8-26 Rehabilitation
Infrastructure
Bidding
Safford, AZ 85546

Rehabilitate and Reconstruct Taxiway
Infrastructure
Post-Bid
$637,300 est. value
Lake Havasu City, AZ 86404

Improvements to Show Low Regional Airport Reconstruct South Apron
Results
$900,000 est. value
Show Low, AZ 85901

Glendale Municipal Airport Taxiway A Rehabilitation Phase II
Infrastructure
Post-Bid
Glendale, AZ 85307

Last Updated 04/12/2022 05:03 PM
Project Title

PSHIA Utility Vault Upgrade and Infield Paving Construction Manager at Risk Services

Physical Address View project details and contacts
City, State (County) Phoenix, AZ   (Maricopa County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $11,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To provide preconstruction services and complete construction services for the Phoenix Sky Harbor International Airport Utility Vault Upgrade and Infield Paving Construction Manager at Risk (CMAR) project. This project involves upgrading utility vaults and manholes across Phoenix Sky Harbor’s south airfield by raising the City’s airfield lighting vaults, replacing vault lids as necessary, adjusting the FAA’s utility and communication vaults, and grading the immediate area around them to improve drainage. The project will also include infield asphalt paving to ensure proper elevations and drainage in the infields to divert water runoff around the utility structures and minimize, if not eliminate, water intrusion within each vault.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents