Similar Projects
2020 Midway Trails Homestead Drive and River Road
Post-Bid
Midway, UT 84049

Goshen Canyon Road Improvements Phase II
Post-Bid
Less than $440,000 est. value
Nephi, UT 84648

UT FLAP 70131(1), Strawberry Sheep Creek
Results
$15,000,000 to $20,000,000 est. value
Charleston, UT 84032

Uintah County West Side Chip Seal
Results
Less than $1,153,392 est. value
Vernal, UT 84078

Pre-Construction Engineering Services for The Duchesne County Road Department Crack Sealing Project
Post-Bid
Duchesne, UT

US-40; Pleasant Valley INT to Myton Rehabilitation High Volume
Results
$1,500,000 to $3,000,000 est. value
UT

UT FTFW OURA 11(1), Auto Tour Route
Post-Bid
$250,000 to $750,000 est. value
Fort Duchesne, UT 84026

US-6; MP 115.26 to MP 123 Preservation Low Volume
Results
$1,500,000 to $3,000,000 est. value
UT

Chip Seal Material for Region Three
Term Contract
Post-Bid

I-15; Juab Co Line to Sevier River High Volume
Results
$10,000,000 to $15,000,000 est. value
UT

Untreated Base Course
Term Contract
Post-Bid

UTSSD Seep Ridge Road – Ouray Bottom Project
Results
Less than $2,163,350 est. value
Vernal, UT 84078

Indefinite Quantity (Idiq) Multiple Award Construction Contract (Macc) For Paving Projects At Various Government Installations Within The Navfac Sw Area Of Responsibility Including But Not Limited To California, Arizona, Nevada, Utah, Colorado, And New Mex
Post-Bid

2019 600 South 300 West to Main Street, 100 West and 200 West Improvements
Results
Less than $1,667,055 est. value
Heber City, UT 84032

Chip Seal
Post-Bid
Heber City, UT

Last Updated 11/25/2019 06:55 AM
Project Title

Various Routes; No-Pass Pennants and Centerline RS HSIP - Highway Safety Improvement/Roadside

Physical Address View project details and contacts
City, State (County) (Duchesne, Juab, Uintah, Wasatch Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The principal items of work are as follows (for all items of work see attachment): Mobilization Slipbase Sign Base (B3) Traffic Control

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents