Similar Projects
Westland Reservoir/Booster Station - Phase II - UT00502 - City of Peoria
Infrastructure
Conception
$5,450,000 CJ est. value
Peoria, IL 61603

New Restroom and Site Work W. H. Sommer Park
New Construction, Infrastructure
Design
$251,000 CJ est. value
Edwards, IL 61528

Bridge Replacements on I-474
Demolition, New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Peoria, IL 61605

Bridge Replacements on I-474
Demolition, New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Peoria, IL 61605

Culver's / Peoria
New Construction, Infrastructure - 4,500 SF
Sub-Bidding
$1,500,000 CJ est. value
Peoria, IL 61615

ICC Fire Station
New Construction, Infrastructure
Sub-Bidding
$2,300,000 CJ est. value
Peoria, IL 61602

ADA Sidewalk
Post-Bid
Chillicothe, IL

Seal Coat
Alteration
Post-Bid
Princeville, IL

Illini Bluffs Saylor Street Parking Lot Phase 1
Results
Less than $211,770 est. value
Glasford, IL 61533

Asphalt Path Replacement at Rock Island Greenway
Results
Peoria, IL

Bus Stop Improvements
Infrastructure
Bidding
$300,000 CJ est. value
Peoria, IL 61603

2021 North Valley Sidewalk Improvements
Alteration
Post-Bid
Peoria, IL

Repair Privately-Owned Vehicle Parking Lot
Results
Less than $1,500,000 est. value
Bartonville, IL 61607

Riverfront Park Paver Replacement
Infrastructure
Bidding
$200,000 CJ est. value
Peoria, IL 61602

Second Street ADA Sidewalk
Infrastructure
Post-Bid
Chillicothe, IL 61523

Last Updated 09/08/2022 12:31 AM
Project Title

Mcclure Avenue and North Street Traffic Signal Removal and Curb Ramp Replacement

Physical Address View project details and contacts
City, State (County) Peoria, IL 61603   (Peoria County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed improvements consist of removing existing traffic signal foundations and handholes and updating sidewalks and ramps to comply with Americans with Disabilities Act (ADA) requirements. All provisions regarding EEO, prevailing wage, certified payroll, and DBE and WBE requirements shall be strictly enforced. All work shall be in compliance with specifications and all state and federal laws and regulations. Before plans and specifications may be obtained, contractors must be pre-qualified. Electronic documents are available by providing contact information (company name, contact name, phone number, fax number and email address) in an email request to pwdropbox@peoriagov.org. Please be specific as to which Project's plans and specs are being requested. All proposals must be accompanied by cash, certified check, cashier's check, or a bid bond for not less than five percent (5%) of the amount of the bid. Within 24 hours after the letting, the two low bidders must file an "Affidavit of Availability" Form BC 57 in triplicate. The successful bidder will be required to furnish a satisfactory Performance Bond for the full amount of the contract, with sureties, to be approved by the City Engineer. Compliance with the Illinois Prevailing Wage Act is required under this contract. The City of Peoria reserves the right to waive technicalities and to reject any or all proposals.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents