Similar Projects
Tyndall AFB Civil Works IDIQ Sources Sought
Design
Panama City, FL 32403

Advance Notice - FY21 SOF Combat Aircraft Parking Apron - North, Hurlburt Field, Florida
Term Contract
Design
$25,000,000 to $100,000,000 est. value
Eglin AFB, FL

Part 139 Airfield Improvements
Infrastructure
Bidding
Tampa, FL 33607

Taxiway A Extension and Mitigation, Key West International Airport
Infrastructure
Bidding
Key West, FL 33040

Homestead ARB BAK 12
Post-Bid
$1,000,000 to $5,000,000 est. value
Homestead, FL 33033

Ground Run-Up Enclosure
Post-Bid
Less than $4,000,000 est. value
Melbourne, FL 32901

General Aviation Center Civil Package
Results
Punta Gorda, FL 33982

Rehabilitate Northeast Quadrant Taxiways A, B and C at Lakeland Linder International Airport
Results
Lakeland, FL 33801

Rehabilitation of Runway 9L-27R Touchdown Zone Keel Repair
Infrastructure
Bidding
Sanford, FL 32773

Taxiway B Rehabilitation Winter Haven Airport
Post-Bid
$358,000 est. value
Winter Haven, FL 33881

Repair Cracks, Joints, Slabs, Airfield
Results
$1,000,000 to $5,000,000 est. value
Patrick AFB, FL 32925

Runway Shoulder Pavement Sealcoating
Infrastructure
Bidding
Tampa, FL

Runway 6-24 and Taxiway B and D Lighting Rehabilitation at Apalachicola Regional Airport
Post-Bid
Apalachicola, FL 32320

Construction Management at Risk Services for the Cecil Airport Eastside Development Site
New Construction - 370,000 SF
Results
Jacksonville, FL 32221

Magnetic Variance Change, Change Runway 1/19 Designation to Runway 2/20
Term Contract
Bidding
$500,000 to $1,000,000 est. value
Eglin AFB, FL 32542

Reported 06/25/2021 12:00 AM
Project Title

Runway and Taxiway Rehabilitation

Physical Address View project details and contacts
City, State (County) Pahokee, FL 33476   (Palm Beach County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $2,700,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitation of RWY 18-36 and all connector taxiways, as well as the construction of blast pads on both runways ends to meet current FAA standards. The project will also relocate the existing Taxiway D (to be renamed Taxiway A3) to the north, eliminating the direct connection between the apron and the runway. This taxiway relocation includes demolition, earthwork, grading, paving, signage and electrical updates. Finally, relocation of REILs is also included in this project.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents