Similar Projects
Kimball Avenue Shared Use Path (Phase 2) - City of South Burlington
Infrastructure, Alteration
Conception
$400,000 est. value
South Burlington, VT 05403

Bartlett Bay Upgrades - City of South Burlington
Infrastructure
Conception
$17,600,000 est. value
South Burlington, VT

Brookside Cottages
New Construction - 79,200 SF
Design
$785,000 est. value
Putney, VT

Site Development for 33 Mobile Home Site for Tri-Park Properties
Infrastructure
Design
Brattleboro, VT

Depot Relocation Installation of Utilities
Infrastructure
Bidding
$320,000 CJ est. value
New Haven, VT 05472

Depot Relocation Installation of Utilities
Infrastructure
Bidding
$320,000 CJ est. value
New Haven, VT 05472

Ductile Iron Pipe 2022
Term Contract
Post-Bid
Rutland, VT

Water Meters 2022
Term Contract
Post-Bid
Rutland, VT

Pleasant Street and Gilman Avenue Area Water, Sewer and Stormwater Improvements
Results
$7,000,000 est. value
Saint Johnsbury, VT 05819

Site Work Services
Term Contract
Results
$60,000 est. value
Montpelier, VT

Founder's Hall Demolition, New Walkways, and Lawn Area
New Construction, Demolition
Construction
$715,000 est. value
Colchester, VT

The Rowland Project
New Construction - 2,500 SF
Construction
$20,000,000 est. value
Manchester Village, VT 05254

Tarrant Event Center - University of Vermont
Addition, Renovation, Infrastructure - 114,012 SF
Pending Verification
$95,000,000 CJ est. value
Burlington, VT 05405

Blakely Road Residential
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Colchester, VT 05446

Commerce Avenue Force Line Replacement - City of South Burlington
Infrastructure
Conception
$275,000 est. value
South Burlington, VT 05403

Last Updated 10/11/2022 02:13 PM
Project Title

BGS - Fort Dummer Utility Improvements

Physical Address View project details and contacts
City, State (County) Guilford, VT 05301   (Windham County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $227,975 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Due to security reasons, please contact Reprographer to obtain bid documents. This project consists of, but is not limited to: Complete construction to replace the existing wastewater disposal system for Toilet Building #2, improve the existing water distribution system servicing the Toilet Building #2 camping loop, and electrical service upgrades. The wastewater portion of the project will include installation of a new 2,000 gallon pump station and valve vault, 2" PVC forcemain, low point drain and high point air releases along the forcemain path, and a Presby mound disposal system, as well as decommissioning existing components. The water system improvements will include replacement of existing galvanized piping with HDPE distribution piping, new water stands and associated high point air release and system drain points. The electrical upgrades will include replacement of the main service feed to TB #2 with a new wall mounted 200A load center/disconnect as well as electrical work to connect the new pump station to the control panel and new load center.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents