Project Title | BGS - Fort Dummer Utility Improvements |
Physical Address | View project details and contacts |
City, State (County) | Guilford, VT 05301 (Windham County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $227,975 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Due to security reasons, please contact Reprographer to obtain bid documents. This project consists of, but is not limited to: Complete construction to replace the existing wastewater disposal system for Toilet Building #2, improve the existing water distribution system servicing the Toilet Building #2 camping loop, and electrical service upgrades. The wastewater portion of the project will include installation of a new 2,000 gallon pump station and valve vault, 2" PVC forcemain, low point drain and high point air releases along the forcemain path, and a Presby mound disposal system, as well as decommissioning existing components. The water system improvements will include replacement of existing galvanized piping with HDPE distribution piping, new water stands and associated high point air release and system drain points. The electrical upgrades will include replacement of the main service feed to TB #2 with a new wall mounted 200A load center/disconnect as well as electrical work to connect the new pump station to the control panel and new load center. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |