Similar Projects
NuLu Crossings Mixed-Use Development
New Construction - 339,000 SF
Conception
$78,000,000 est. value
Louisville, KY 40202

NuLu Crossings Mixed-Use Development
New Construction - 339,000 SF
Conception
$78,000,000 est. value
Louisville, KY 40202

Caliber Collison - Abercrombie and Associstion
New Construction, Infrastructure - 14,704 SF
Design
$4,000,000 CJ est. value
Walton, KY 41094

Union Promenade
New Construction - 155,000 SF
Design
$150,000,000 est. value
Union, KY 41091

Fort Campbell Construction, Repair, Restoration and Rehabilitation of Roadways and Hardstands
Infrastructure
Bidding
$100,000,000 CJ est. value
Fort Campbell, KY 42223

Shillito and Southland Parks Parking Lot Renovation
Infrastructure
Bidding
$400,000 CJ est. value
Lexington, KY 40503

Athletico Physical Therapy
Build-Out - 3,928 SF
Post-Bid
Louisville, KY 40243

Liberty Financial Remote Parking Lot
Infrastructure
Post-Bid
Louisville, KY 40223

Dayton SRTS
Results
$191,962 est. value
Dayton, KY

KY 237 Multi-Use Path
Infrastructure
Results
Burlington, KY 41005

Ohio County Hospital Surgery Room
Addition
Construction
Hartford, KY 42347

Fast Pace Urgent Care
New Construction - 3,726 SF
Construction
$500,000 to $1,000,000 CJ est. value
Brandenburg, KY 40108

Westport Road Medical Office
New Construction - 6,250 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Louisville, KY 40222

Home Emporium/Louisville
New Construction, Infrastructure - 25,000 SF
Pending Verification
$6,000,000 CJ est. value
Louisville, KY 40299

Old Schoolhouse Lane Subdivision
New Construction, Infrastructure
Conception
$35,000,000 CJ est. value
Lexington, KY 40513

Last Updated 03/15/2023 02:08 PM
Project Title

Cumberland Family Medical Center Inc. - Lincoln First Choice

Physical Address View project details and contacts
City, State (County) Stanford, KY 40484   (Lincoln County)
Category(s) Heavy and Highway, Medical
Sub-Category(s) Medical Office/Outpatient, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Cumberland Family Medical Center, Inc. will receive bids for construction of the Lincoln First Choice in Stanford, Kentucky. This project consists of the following bid packages: earthwork, asphalt, concrete, masonry, structural steel, general construction, roofing, storefront and windows, drywall, acoustical ceiling, floor coverings, painting, casework, plumbing, HVAC and electrical. Each selected contractor must have a competent Superintendent/Foreman on site (no subcontracting the work without a representative from the contracted firm being on site will be tolerated). Each contractor will be required to provide proof of worker's compensation and general liability insurance. Cumberland Family Medical Center, Inc. will be the certificate holder and the project name must be listed on the certificate. Cumberland Family Medical Center, Inc. must be listed as additional insured for general liability. A detailed project schedule will be compiled before construction begins; our anticipated overall time frame is fourteen (14) months from commencement to substantial completion. All questions need to be submitted in writing to shonaker@cfmcky.com no later than 10:00 AM EST, March 1, 2023. If the bid amount is over $250,000.00 the bidder will need to supply a 5% bid bond and successful contractor will be required to provide a 100% Performance & Payment Bond. Supplies broken out for Owner direct purchase are not required to be included in the Performance and Payment Bond The Owner reserves the right to reject any and all bids or to waive any informality in the bidding. No bid may be withdrawn for a period of sixty days subsequent to the opening of bids without consent of Cumberland Family Medical Center, Inc.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents