Last Updated | 10/18/2023 08:40 AM |
Project Title | Water Treatment Plant Garage Roofing Replacement |
Physical Address | View project details and contacts |
City, State (County) | Midland, MI 48642 (Midland County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $300,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Reference Number 0000332726 Technical questions shall be directed to Tyler Abbs, City of Midland Facilities Manager at (989) 837-3370. QUESTIONS AND CLARIFICATIONS: The City of Midland Official Point of Contact, for submission of questions and clarifications related to this bid: Tyler Abbs, City of Midland Facilities Manager 333 Ellsworth St. Midland, MI 48640(989) 837-3370 tabbs@midland-mi.org General Requirements - Bid Deposit Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % A certified check or bid bond for a sum of not less than five percent (5%) of the amount of the Proposal will be required with each bid. *The City reserves the right to accept or reject all or any parts of any and all bids, to waive irregularities and to award in the best interests of the City of Midland. SCOPE OF WORK: Will be for the removal and replacement of Water Treatment Plant Garage Roof located in Midland, MI. i. Tear off all roofing membrane and flashings down to the deck, dispose of legally. ii. Remove any items identified by the owner as abandoned. iii. Furnish and install 1 layer of new 2.5" Elevate ISO mechanically fastened. iv. Furnish and install a new 1/4" per foot Tapered ISO Saddles as shown on drawing. v. Furnish and install new fully adhered .060 mil EPDM. Provide all necessary details at projections, flashings, drains etc. for a complete watertight system. vi. Furnish and install new ANSI/SPRI ES 1 Kynar coated 24 gauge Hickman PermaSnap Coping System. vii. Provide a full system Firestone Red Shield 20 year warranty. viii. Job will have daily site inspections by MWA. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |