Similar Projects
Wausau - Merrill Const / Recondition
Infrastructure
Design
$3,000,000 CJ est. value
Merrill, WI 54452

Wausau - Merrill Const / Recondition
Infrastructure
Design
$3,000,000 CJ est. value
Merrill, WI 54452

Toilet Shower Building and Vault Toilet Replacement Council Grounds State Park - GPC (General Prime Contractor)
Demolition, New Construction, Infrastructure - 1,175 SF
Bidding
$1,118,100 CJ est. value
Merrill, WI 54452

Toilet Shower Building and Vault Toilet Replacement
Addition, Demolition, Infrastructure
Bidding
$270,165 CJ est. value
Merrill, WI 54452

Merrill Site Improvements
Infrastructure
Post-Bid
Merrill, WI 54452

2022 Pulverizing
Infrastructure
Post-Bid
WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Merrill - Tomahawk, Bridge B-35-0053
Infrastructure
Results
$40,000 est. value
WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Furnish and Apply Emulsion Oil
Infrastructure
Post-Bid
WI

West Somo Avenue Rehabilitation and Marks Street Utility Improvements
Infrastructure
Results
Tomahawk, WI 54487

Paving Work on 26th Avenue (Swamp Road)
Infrastructure
Post-Bid
$80,000 est. value

Road Repair
Infrastructure
Results
$130,000 est. value
Merrill, WI

Reconditioning of Mosch Road
Infrastructure
Post-Bid
$400,000 est. value
Tomahawk, WI 54487

Last Updated 05/08/2023 09:37 AM
Project Title

Asphalt Replacement Lincoln Hills & Copper Lake Schools

Physical Address View project details and contacts
City, State (County) Irma, WI 54442   (Lincoln County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,238,670 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

All potential bidders must be certified by DOA prior to submitting bids on state construction projects over $50,000. All bids received from contractors who are not certified will be rejected. Contractor certification applications and instructions for completing the form may be obtained from the DOA Website 1DFD Contractor Certification page or upon request from DFD--email dfdcertification@wisconsin.gov. This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime The bidder is responsible for the sealed bid being delivered to the indicated location or email before the time specified for the bid submission. Third party delivery is entirely at the bidder's risk contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. If a project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, DFD will bid one bid package for all work to general prime contractors. US Mail or Third-party delivery (UPS, Fedex, or DHL) to State of Wisconsin, Administration Building, 7th 41 Floor, 101 East Wilson Street, Madison, Wisconsin 53703; or o Hand delivery to the drop box labeled SEALED BIDS ONLY in front of the State of Wisconsin Administration Building located at 101 East Wilson Street, Madison, Wisconsin 53703. In general the work consists of minor grading, mill/pulverizing/removal of existing asphalt pavement, sawcutting asphalt and concrete, excavation below subgrade, placing base course, hot mix asphalt pavement, concrete pavement, storm sewer, pavement marking, placing and maintaining erosion control, site restoration and other miscellaneous items of work

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents