Similar Projects
Lesterville Bank Stabilization Missouri River Mile 816.5 Yankton County, SD
Design
$250,000 to $500,000 est. value
SD

Sturgis Road Inlet - 3500 Block
Infrastructure
Bidding
Rapid City, SD 57703

Culvert Cleaning and Lining
Infrastructure
Bidding
SD

East 1st Street Extension
Post-Bid
$4,000,000 est. value
Tea, SD 57064

Replacing Existing Main Distribution Areas - Water Department and Installation of Flood Wall Berm at Pelican Sub - Electric Department
Post-Bid
Watertown, SD

Box Culvert
Results
Less than $412,357 est. value
Junius, Madison, SD 57042

Basin 104 Drainage Improvements
Results
$3,680,000 est. value
Sioux Falls, SD 57106

A0150000-ERFO SD2019-1-BIA Site Number 809-1 Culvert Replacement Project BIA Route 809, Mile Marker 1.2
Infrastructure
Bidding
Eagle Butte, SD

FEMA Storm 4463 Culvert Replacement
Post-Bid
$1,291,327 est. value
Eagle Butte, SD

Split Rock Creek Bank Stabilization
Results
$360,000 est. value
Brandon, SD 57005

Westside Park Pond Improvements
Infrastructure
Bidding
Yankton, SD

BIA Route 2 and 12, FEMA 4467 Culvert Replacement
Post-Bid
$2,189,900 est. value
Eagle Butte, SD

Manderson Pathway
Results
$1,214,346 to $1,274,496 est. value
Pine Ridge, SD

ERFO Roadway Realignment and Reconstruction - BIA 12, Mile Marker 9.5
Infrastructure
Bidding
Eagle Butte, SD

Road Blading, Snow Removal Road, Ditch Mowing Loading and Hauling Gravel, Graveling of Roads Culvert Repair Backhoe for Culvert and Road Repair
Term Contract
Post-Bid
Watertown, SD

Last Updated 04/02/2022 03:00 PM
Project Title

Alexandria Wastewater Treatment Pond Improvements

Physical Address View project details and contacts
City, State (County) Alexandria, SD   (Hanson County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Wastewater Treatment Pond Dike Improvements 1. 2,265 feet of dike shaping 2. 198 CY of erosion removal 3. 150 CY of placing borrowed fill material 4. 2,036 SY of filter fabric 5. 1,100 tons of rip rap 6. 2,400 SY of seeding, fertilizer and mulch 7. Related items needed to complete the pond dike repairs

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents