Similar Projects
Seal Coat
Infrastructure
Sub-Bidding
$1,570,000 CJ est. value
Fargo, ND 58102

Concrete Pavement Repair
Infrastructure
Post-Bid
$800,000 CJ est. value
Wahpeton, ND 58075

Greenhouse Concrete Replacement
Infrastructure
Post-Bid
$800,000 CJ est. value
Fargo, ND 58102

Airfield Pavement Slurry Seal
Infrastructure
Results
$231,443 CJ est. value
Edgeley, ND 58433

Milling, HMA Overlay, Curb Ramps, CPR, Curb, and Lighting Improvements
Infrastructure
Results
$1,258,354 CJ est. value
Courtenay, ND 58426

Paving and Rehab/reconstruction
Infrastructure
Construction
$2,947,620 CJ est. value
Fargo, ND 58102

Far - South Ga Apron Reconstruction
Infrastructure
Post-Bid
$400,000 CJ est. value
Fargo, ND 58102

Micro-Mill, Slurry Seal and Micro Surfacing
Infrastructure
Results
$1,717,611 CJ est. value
New Salem, ND 58563

2023 CP No. 4 Street, Sidewalk & ADA Improvements
Infrastructure
Post-Bid
$1,363,000 CJ est. value
Grand Forks, ND 58203

Water, Sewer, Storm and Street Improvement District No. 2022-11 Cub Creek 2nd Addition
Infrastructure
Results
$16,111,086 CJ est. value
Horace, ND 58047

Eastview FEMA Repairs
Infrastructure
Post-Bid
$400,000 CJ est. value
Larimore, ND 58251

Chip Seal
Infrastructure
Results
$719,921 CJ est. value
Beach, ND 58621

Construct Deicing Containment Area
New Construction, Infrastructure
Post-Bid
$900,000 CJ est. value
Williston, ND 58801

Milling and RAP Hot Mix Asphalt Overlay
Infrastructure
Results
$2,634,830 CJ est. value
Valley City, ND 58072

DSU Request for Concrete repairs
Renovation
Post-Bid
$128,000 CJ est. value
Dickinson, ND 58601

Last Updated 02/14/2024 12:11 PM
Project Title

ECRWD - Facility Expansion

Physical Address View project details and contacts
City, State (County) Thompson, ND 58278   (Grand Forks County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $6,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Description: The Work is comprised of two (2) Contracts or one (1) combined Contract: Individual Bids will be received for each Contract. The Owner will not accept a combined bid unless that Bid is lower than the combined total of the lowest and best Bids for the Separate Contracts. The Work for each Contract is generally described as follows: Contract No. 1: General Construction: 1. Jensville Vault: Consists of construction of a new 12-foot 4-inch by 12-foot 4-inch cast in place or prefabricated below grade meter and PRV station; with interior POLY process piping, magnetic flow meters, pressure transducers, gate valves, domestic interior sump pump system, and; associated fittings; exterior piping; site work; restoration and seeding; and all associated work. 2. Reservoir 9: Consists of removal of an interior wall and minor interior process piping and the addition of interior POLY process piping, magnetic flow meters, pressure transducers, gate valves, and; associated fittings; exterior piping; site work; restoration and seeding; and all associated work. 3. Grandin Pipe Gallery: Consists of construction of a new 9-foot 2-inch by 20-foot 4-inch cast in place below grade meter and PRV station; with interior POLY process piping, magnetic flow meters, pressure transducers, gate valves, domestic interior sump pump system, and; associated fittings; exterior piping; site work; restoration and seeding; and all associated work. Contract No. 2: Electrical Construction: 1. Jensville Vault: Consists of construction of a new 12-foot 4-inch by 12-foot 4-inch cast in place below grade meter and PRV station; with interior POLY process piping, new 120/240V utility service, grounding, electric unit heater, control panel, magnetic flow meters, pressure transducers, domestic interior sump pump system, lighting, and all associated work. 2. Reservoir 9: Consists of removal existing control pane, VFD control panel and associated circuitry; installation of two new VFD's, one new control panel, flow meters, pressure transducers and replacing of existing lighting. 3. Grandin Pipe Gallery: Consists of construction of a new 11-foot 2-inch by 20-foot 4-inch cast in place below grade meter and PRV station; with interior POLY process piping, new load center, new electric unit heater, magnetic flow meters, pressure transducers, gate valves, domestic interior sump pump system, and; associated fittings; exterior piping; site work; restoration and seeding; and all associated work. Contract No. 3: Combined General and Electrical Construction: Consists of all Work described under Contracts No. 1 and No. 2. All bids shall be contained in a sealed envelope plainly marked showing that such envelope contains a Bid for the Project. Also refer to Section 00 21 13 for preparation of bid information. All Bids shall be prepared according to the Instructions to Bidders contained within the Project Manual. Each Bid shall be accompanied by a separate envelope containing a Bid Security in the form of a Bidder's Bond executed by the Bidder as principal and by a surety company authorized to do business in the State of North Dakota, payable to the East Central Regional Water District, in a sum equal to five percent (5%) of the full amount of the Bid. A certified check in lieu of a surety company in the amount of 5% of the total project cost will not be accepted. This is to serve as a guarantee that the successful Bidder will enter into a Contract within fifteen (15) days of Notice of Award, in accordance with the terms of the principal's Bid and Contractor's Bond as required by law and regulations and determinations of East Central Regional Water District for the performances of such Work. Only Bids that are accompanied by such a Bond will be considered. All Work shall be performed in accordance with the Bidding Documents on file in the Office of East Central Regional Water District Thompson, ND where they may be seen and examined. Bidders must be licensed for the full amount of the Bid as required by North Dakota Century Code 43-07-05. Each Bid shall contain a copy of the Contractor's license or certificate of renewal thereof issued by the Secretary of State. All Bids must be submitted on the Bid Form furnished by the Engineer. No Bid will be read or considered that does not fully comply with the above provisions and other provisions contained within the Bidding Documents, and any deficient Bid submitted will be returned to the Bidder unopened. Contracts shall be awarded on the basis of the low Bid submitted by a responsible and responsive Bidder deemed most favorable to the Owner's interest. The work for each contract must be completed no later than the following: 1. Contract No. 1 a. Jensville Vault 1) Substantial Completion - October 15, 2022 2) Final Completion - June 1, 2023b. Reservoir 9 1) Substantial Completion - December 15, 2022 2) Final Completion - June 1, 2023c. Grandin Pipe Gallery 1) Substantial Completion - November 15, 2022 2) Final Completion - June 1, 20232. Contract No. 2 a. Jensville Vault 1) Substantial Completion - October 31, 2022 2) Final Completion - June 1, 2023b. Reservoir 9 1) Substantial Completion - December 31, 2022 2) Final Completion - June 1, 2023c. Grandin Pipe Gallery 1) Substantial Completion - November 30, 2022 2) Final Completion - June 1, 20233. Contract No. 3 a. Jensville Vault 1) Substantial Completion - October 31, 2022 2) Final Completion - June 1, 2023b. Reservoir 9 1) Substantial Completion - December 31, 2022 2) Final Completion - June 1, 2023c. Grandin Pipe Gallery 1) Substantial Completion - November 30, 2022 2) Final Completion - June 1, 2023 All Bids will be made on the basis of cash payment for such work. After Bid opening, the Owner will return Bid security of all except the three lowest responsible Bidders. When the Contract is awarded, the remaining unsuccessful Bidder's Bonds will be returned. The Owner reserves the right to reject any or all Bids, and further reserves the right to award the Contract in the best interests of the Owner. The Owner reserves the right to hold the three (3) low Bids for a period of sixty (60) days after the date of the Bid opening to complete financial arrangements.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents