Similar Projects
2023 Summer Electrostatic Painting
Renovation
Sub-Bidding
$100,000 CJ est. value
Schaumburg, IL 60194

STEM Magnet_Lead-Based Paint Mitigation_ Various Areas
Renovation
Sub-Bidding
$30,000 CJ est. value
Chicago, IL 60607

Streetlight Painting
Alteration
Post-Bid
Glenview, IL

Painting Services to Paint Twenty-Three (23) Stations
Term Contract
Post-Bid
Chicago, IL

Bridge Painting on (SNs 016-0343, 016-0344) Carrying US Route 45 over the Cal Sag Channel in unincorporated Cook County
Alteration
Results
IL

Four Flaggs Tank Rehab, Painting and Tower Facilities Lightning Protection and Oriole Tower Lightning Protection
Infrastructure, Alteration
Results
Niles, IL 60714

GAP #0503 - Refresh
Renovation
Construction
Chicago, IL 60657

Court Repair, Color Coating, and Striping
Alteration
Post-Bid
Hoffman Estates, IL

Franklin Elementary School Lead Based Paint Mitigation
Renovation
Results
$42,330 CJ est. value
Chicago, IL 60610

Digester Cover Painting at Various Locations
Term Contract, Alteration
Post-Bid
$720,000 est. value
Chicago, IL

Oriole Pool Painting Project
Renovation
Results
$220,000 CJ est. value
Morton Grove, IL 60053

REHM Pool Painting
Infrastructure, Alteration
Post-Bid
Oak Park, IL 60304

John H Smyth Paint 1st , 2nd, 3rd Floor Hallways and Stairwells- Only Pre-Qualified Various Trades
Renovation
Results
$315,970 CJ est. value
Chicago, IL 60608

Meadowhill Aquatic Center Pool Slide Gelcoat and Painting
Alteration
Post-Bid
Northbrook, IL 60062

Pedestrian Bridge Painting
Infrastructure
Results
$433,833 CJ est. value
N Riverside, IL 60546

Last Updated 03/21/2023 11:47 AM
Project Title

Portage Park Elementary School - Main Building Patch and Paint Various Trades

Physical Address View project details and contacts
City, State (County) Chicago, IL 60641   (Cook County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $629,767 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Provide labor and materials to patch, prep and paint various interior walls and ceilings throughout the main building of Portage Park Elementary to restore to a uniform acceptable appearance. This is to include classrooms, hallways, stairwells & vestibules across the 1st, 2nd and 3rd floors. Note that environmental testing and mitigation by a RRP certified contractor has already taken place for this work. Floor plans from previously completed RRP project will be provided as reference material of the base scope of areas to be addressed. There may be some affected areas not indicated on the floor plans that are to be included in the scope of work. If damaged paint or plaster beyond what is indicated in the floor plans is found, it is to be included in the scope of work to ensure that no damage remains. For Portage Park Elementary School - Main Building Patch and Paint Various Trades. Questions Due Date: Dec 19th 2022, 7:30 PM CST

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents