Similar Projects
Storm Water Pump Station
New Construction
Bidding
Porter Heights, TX

Airport Pump Station Expansion
Addition
Bidding
$2,800,000 to $2,400,000 est. value
Stephenville, TX

Elmendorf Water Supply Project
Post-Bid
Elmendorf, TX 78112

Wastewater Treatment Plant Rehabilitation and Lift Station Conversion
Post-Bid
$1,365,000 est. value
Katy, TX 77449

Pine Lake Cove - Lift Station No. 1
Results
Conroe, TX

DCRRD Pump Station Upgrade Project 2020
Results
Carrollton, TX 75010

Bay Colony Lift Station Expansion Phase I
Construction
League City, TX 77573

Highway 84 Corridor Wastewater System Improvements Phase 2 Contract A
Construction
Less than $8,102,100 est. value
McGregor, TX 76657

Hill Park Storm Water Pump Station Project
New Construction
Bidding
Midland, TX

Lift Station 12 Rehabilitation
Post-Bid
$450,000 to $500,000 est. value
Texas City, TX 77590

Maxwell Creek Lift Station Bypass Pump
Results
Allen, TX 75002

Travis Ranch 3F Lift Station Improvements
Post-Bid
Heath, TX 75087

Bill Little Pump Station - Load Bank and Utility Disconnect Addition
Results
TX

Grigsby Lift Station Rehabilitation Project
Post-Bid
Port Neches, TX 77651

Booster Pump Replacement
Results

Last Updated 11/11/2021 12:07 PM
Project Title

ROCRWS - Peak Flow Storage System and Flood Improvements

Physical Address View project details and contacts
City, State (County) Waxahachie, TX 75165   (Ellis County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $16,000,000 to $18,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition of existing structures as follows: Existing Storm Water Pump Station, Existing Manhole, Existing Fence, Existing Outfall Structure. Modification of existing structures as follows: Existing Influent Pump Station No. 1, Existing Preliminary Treatment Building – Headworks, Existing Filter Effluent Channel, Existing Effluent Flow Meter Station, Existing Aeration Basin 1C air piping and valving. Construction of new structures and equipment as follows: Influent Pump Station No. 2, Storm Water Pump Station, Peak Flow Storage Tank, Odor Control System, Non-Potable Water Booster Pump Station, Stormwater Pond, Flood Protection Berm, Permanent TRA Construction Services Trailer, Site work, grading, paving, drainage, fencing and roads, Plant and storm water piping, Electrical and Instrumentation.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents