Similar Projects
Roof Replacement at Centennial Hall and Grasso Hall WCSU Westside Campus
Bidding
Danbury, CT 06810

Ferrara Elementary Portable Classroom Roof Replacement
Bidding
East Haven, CT 06513

Town Hall Upper Flat Roof Repairs
Term Contract
Post-Bid
Clinton, CT 06413

Reroofing at Birchwood Terrace
Post-Bid
Danielson, CT 06239

Norwalk Roof and HVAC Department of Motor Vehicles Branch Office Facility
Results
$831,343 to $875,097 est. value
Norwalk, CT 06851

Flanders Elementary School Roof Replacement
Results
Less than $866,345 est. value
East Lyme, CT 06333

Sage Park Middle School Roof Replacement
Bidding
Windsor, CT 06095

Design-Build Services for Roof Replacement at Anamet Property
Post-Bid
Waterbury, CT

Partial Roof Replacement at Southington High School
Results
Southington, CT 06489

Partial Roof Replacement at Glenbrook Fire Department
Bidding
Stamford, CT 06906

Siding And Roof Sealing
Post-Bid
Stamford, CT 06901

Partial Roofing Replacement at Ben Franklin Community Center - Phase 2
Results
Less than $300,000 est. value
Norwalk, CT 06854

Nunnawauk Meadows - Roofing
Post-Bid
Newtown, CT 06470

Roof Replacement at Andover Public Works Facility
Results
Less than $53,000 est. value
Andover, CT 06232

Roof Improvements at Wolfe
Post-Bid
New Haven, CT

Last Updated 12/18/2020 09:25 AM
Project Title

Chemistry Building Roof Snow Guards

Physical Address View project details and contacts
City, State (County) Tolland, CT 06269   (Tolland County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Roofing Contractors for the Chemistry Building Roof Snow Guards. The Chemistry Building, located at the University of Connecticut (UConn), Storrs Campus, it has a brickveneered structure with a metal standing-seam roof. The main building is separated into three (3) distinct wings, Teaching, Research, and Administration, and includes an auditorium extension located to the southwest of the main building. There is active snow/ice slide safety issue which resulted in the imposed placement of temporary overhead protection at entrances and adjacent sidewalks. A complete evaluation, engineering, design, to prepare drawings and technical specifications is currently underway. The project will replace the standing-seam roof snow guard systems for the entire facility

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents