Similar Projects
South Primary Clarifier Rebuild Wastewater Treatment Plant - Labor Only
Renovation
Bidding
Milledgeville, GA

Bioxide Odor and Corrosion Control
Term Contract
Post-Bid
Savannah, GA 31400

Membrane Replacement on Anaerobic Digester Covers Water Pollution Control Plant
Post-Bid
Milledgeville, GA

NOWRF and MOWRF Tertiary Filtration
Results
Athens, GA

Interstate Centre WWTF and LAS Expansion
Renovation, Addition
Results
Richmond Hill, GA 31324

Middle Oconee WRF Maintenance Building
New Construction
Construction
Less than $1,345,000 est. value
Athens, GA 30606

USDA Sewer System Improvements
Post-Bid
Thomaston, GA

Intrenchment Creek WRC Decommission and South River Wrc Primary Clarifiers Replacement
Results
Atlanta, GA 30303

SCWRF Vent and Flare System
New Construction
Post-Bid
Columbus, GA 31901

Indian Creek WRF Copper Removal System
Results
Madison, GA 30650

Flat Creek WRF Clarifier Renovation
Renovation
Post-Bid
Gainesville, GA 30504

Water Reclamation Facility Improvements - Addition of 2 Clarifiers
Results
Less than $2,300,000 est. value
Hoschton, GA 30548

North Oconee WRF and Middle Oconee WRF Improvements
Renovation
Post-Bid
$23,000,000 to $26,000,000 est. value
Athens, GA 30605

Residuals Management Filter Press 2 Refurbishment - James E. Quarles Water Treatment Plant
Results
Less than $186,186 est. value
Marietta, GA 30068

US-78 Lanier Sewer Pump Station Decommissioning
Demolition
Post-Bid
GA

Reported 12/17/2021 12:00 AM
Project Title

Wastewater Treatment Facility Improvements

Physical Address View project details and contacts
City, State (County) Abbeville, GA   (Wilcox County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Work To Be Done shall consist of furnishing all products and performing all labor necessary to dredge two (2) ponds totaling approximately 5.36 acres of sludge (estimated 1,460 tons) from the Abbeville Wastewater Treatment Ponds. Work shall also include the proper disposal and dewatering of sludge removed as well as grit removal and all other appurtenances necessary to complete the project in accordance with the specifications and construction drawings.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents