Similar Projects
Indoor Soccer Facility
New Construction - 10,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Lawrenceville, GA 30044

Burger Park - 268 - City of Smyrna
New Construction
Conception
$250,000 est. value
Smyrna, GA 30080

RFQ Construction Manager at Risk - Student Athlete Enabling Infrastructure
Renovation
Design
$150,000 CJ est. value
Atlanta, GA 30334

Heard County Middle Baseball/Softball Press Box
New Construction, Infrastructure
Bidding
$300,000 CJ est. value
Franklin, GA 30217

Crisp County Middle School Sports Complex
New Construction, Infrastructure
Bidding
$7,000,000 CJ est. value
Cordele, GA 31015

Peach County High School Athletic Complex
New Construction
Post-Bid
Fort Valley, GA 31030

Elementary Renovations/Additions, Athletic Facility Upgrades, and CTAE Facility
Renovation, Addition
Post-Bid
Thomaston, GA

Middle School and High School Athletics Renovations
Renovation
Results
GA

Repurpose and Renovate PAC for Student Services
Renovation
Results
Savannah, GA 31419

Philadelphia Romanian Church
Addition - 14,285 SF
Construction
Lawrenceville, GA 30045

FY20 Premier Sports Athletic Complex
Construction
Douglas, GA

Crossroads of Life Baptist Church
New Construction - 15,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Canton, GA 30114

Old Riverside Park Construction - City of Sandy Springs
New Construction
Conception
$5,000,000 est. value
Sandy Springs, GA 30328

Visitors Side Press Box Renovation
Renovation
Post-Bid
Vienna, GA 31092

The Macomber Ball Field Improvements
New Construction
Results
Statesboro, GA 30459

Last Updated 08/08/2022 05:07 PM
Project Title

White County High School Performing Arts Center and Athletic Complex

Physical Address View project details and contacts
City, State (County) Cleveland, GA 30528   (White County)
Category(s) Entertainment/Recreation
Sub-Category(s) Athletic Facility
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

New home for performing arts in White County School board members broke ground Tuesday on a new 41,000 square-ft. performing arts center on the campus of White County High School. From left are Linda Erbele, vice-chairman Charlie Thomas, Superintendent Dr. Laurie Burkett, chairman Missy Jarrard and Jon Estes. Body Officials broke ground Tuesday on a new performing arts center for the White County School District that will double the seating capacity of the current facility. When completed sometime next year, the 41,000 square-foot single-story building, located at the former site of the baseball field on the campus of White County High School, will contain a 700-seat performing arts theater, along with choral, band and drama suites with supporting and administrative spaces. The construction costs, estimated in excess of $10 million, are being paid from the proceeds of a Education Special Local Option Sales Tax that was approved by voters. "This is super exciting," said Superintendent Laurie Burkett at Tuesday's groundbreaking. "None of this happens without our community supporting our ESPLOST referendum." "White County has nothing like this," school board vice-chairman Charlie Thomas said in a story published in the White County News earlier this year. "We've never had a facility like this. It's going to seat around 700 to 750. There's no place in this county to have that kind of gathering together. My vision of this facility, it's not just for the school, it's for the entire community. I can see concerts happening here, movie nights, meetings. I just think there's a lot of things that will greatly enhance this community." Burkett praised the resolve of school board members, who continued to support the project in times of economic uncertainty. "This was a time when things were a little scary, when your numbers creep up for different reasons," Burkett said. "At any point, we could have said nope, but we didn't." Burkett also thanked the planning committee members who contributed their time and expertise to planning for the new facility. "I'm grateful to live in a place where lots of people care a whole lot," she said. The new performing arts building is just one of several construction and improvement projects underway throughout the school district. In the past year, the school board purchased nearly 15 acres of land adjacent to the high school that will be used for baseball and softball fields and other enhancements. Charles Black Construction is the builder for the performing arts center project. Architecture work is being done by Breaux and Associates. ____________________________ Bid Results will only be available to those companies that submit a bid. The project includes a new single story building containing a 700 seat performing arts theater. Also included will be a choral, band, and drama suites with supporting spaces and administrative spaces. Additionally, a new athletics complex. The construction phase involves completing the Performing Arts Center (PAC) and Athletic Complex - White County High School per the Construction Manager's schedule. Substantial Completion for the Performing Arts Center is May 31, 2023. Substantial Completion for the Baseball Field is January 1, 2023. The Practice Field and Softball Field must be completed by April 2023. Bid Package Number Name 1 Sitework 2 Curb & Gutter, Asphalt Paving 3 Fencing 4 Concrete 5 Masonry 6 Structural, Miscellaneous Steel 7 TPO Roofing 8 Standing Seam Metal Roofs 9 Hollow Metal Doors, Frames & Hardware 10 Installation of Doors & Hardware 11 Overhead Coiling Doors 12 Aluminum Framed Storefront / Glass & Glazing 13 Drywall / Ceilings / EIFS / Acoustical Panels 14 Resilient Tile Flooring, Carpet, Base & Accessories 15 Ceramic Tiling 16 Decorative Resinous Epoxy Flooring 17 Interior & Exterior Painting 18 Specialties 19 Aluminum Canopies 20 Theatre & Stage Equipment 21 Fixed Auditorium Seating 22 Manufactured Casework 23 Plumbing 24 Fire Protection 25 HVAC 26 Electrical 27 Applied & Intumescent Fireproofing Emergency lighting fixtures, presently shown to operate 24/7, shall be routed through UL approved emergency lighting transfer contactors.

Details

1 Story Above Grade, 41,100 SF.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents