Similar Projects
Cascade Jr/Sr HS New Lift Station and Forcemain
Addition
Bidding
$300,000 est. value
Clayton, IN 46118

Boone Grove High School - New Wastewater Treatment Plant
New Construction
Bidding
$650,000 est. value
Valparaiso, IN 46385

Truesdell Lift Station and Sewer Extension
Post-Bid
La Porte, IN 46350

Cane Run Flood Control Pumping Station 5
Post-Bid
$5,000,000 to $6,000,000 est. value
Jeffersonville, IN

Carriage House Lift Station Rehabilitation
Results
Less than $353,300 est. value
Evansville, IN

Crawfordsville Board of Public Works and Safety Big Four Arch Lift Station
Results
Crawfordsville, IN

Bud Meeks Lift Station Improvements
Renovation
Bidding
$400,000 est. value
Fort Wayne, IN

Wastewater Treatment Plant And Lift Station Upgrade
Post-Bid
Rochester, IN

Wastewater Collection System and Lagoon Improvements Project
Results
Morgantown, IN

Market Survey/Sources Sought for Construction Work at Gary Sanitary District - 27th and Chase Pump Station Force Main Replacement, In Lake County, Gary, Indiana
Post-Bid
Gary, IN

Schoolview Drive Lift Station Improvements
Results
Rochester, IN

Lake Station Crossroads Lift Station Replacement - Section 219
Post-Bid
$1,000,000 to $5,000,000 est. value
Lake Station, IN

Junior Warfield Lift Station Drive Replacement
Results
Less than $388,420 est. value
Evansville, IN

Airport Lift Station Rehabilitation
Post-Bid
Sellersburg, IN 47172

LTCP Phase II Improvements
New Construction
Results
IN 46952

Reported 05/25/2022 12:00 AM
Project Title

Gibson Street Regional Lift Station

Physical Address View project details and contacts
City, State (County) Winfield, IN 46307   (Lake County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Copy Center - 03/28/22
Owner View project details and contacts
Architect View project details and contacts
Description

For the construction of the Town of Winfield Gibson Street Regional Lift Station. The project consists of the construction of a new lift station building, precast concrete wet well and valve vault, submersible pumps, piping and valves, forcemain and gravity sewer, emergency generator and electrical controls.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Packaged Generator Assemblies.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents