Similar Projects
Metro Parkway Resurfacing - Mound Road to Ryan Road - City of Sterling Heights
Infrastructure
Conception
$1,200,000 est. value
Sterling Heights, MI 48310

Dobry Drive Resurfacing - Ryan Road East To Crossover
Alteration
Conception
$1,000,000 est. value
Sterling Heights, MI 48310

American Muslim Diversity Association
Addition, Demolition, Infrastructure - 13,348 SF
Design
$4,300,000 CJ est. value
Sterling Heights, MI 48314

American Muslim Diversity Association
Addition, Demolition, Infrastructure - 13,348 SF
Design
$4,300,000 CJ est. value
Sterling Heights, MI 48314

Take 5 Oil Change / Warren
New Construction, Infrastructure - 1,430 SF
Post-Bid
$420,000 CJ est. value
Warren, MI 48093

Take 5 Oil Change / Warren
New Construction, Infrastructure - 1,430 SF
Post-Bid
$420,000 CJ est. value
Warren, MI 48093

2022 Local Road Resurfacing
Infrastructure
Results
Utica, MI

0.82 MI of Full Depth Replacement and Joint and Crack Sealing on Klein Road from Garfield Road North to 15 Mile Road
Infrastructure
Results
Fraser, MI

Valvoline
New Construction, Renovation - 3,776 SF
Construction
$500,000 to $1,000,000 CJ est. value
Shelby Township, MI

Jefferson Avenue Office
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
St Clr Shores, MI 48080

Jefferson Avenue Office
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
St Clr Shores, MI 48080

15 Mile Road Resurfacing - Van Dyke Avenue to Maple Lane - City of Sterling Heights
Infrastructure
Conception
$1,200,000 est. value
Sterling Heights, MI 48310

Speedway Gas Station and Convenience Store / Shelby Township
New Construction, Infrastructure - 4,608 SF
Design
$1,400,000 CJ est. value
Shelby Township, MI 48317

2022 Pavement Preservation Project
Infrastructure
Post-Bid
$2,000,000 est. value
Mount Clemens, MI

Concrete Pavement Repair on M-29
Infrastructure
Results
MI

Last Updated 09/05/2023 09:36 AM
Project Title

Circle A

Physical Address View project details and contacts
City, State (County) Sterling Heights, MI 48310   (Macomb County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

*Public information validates this project is under construction. Additional information will not be provided.

Details

1 Story Above Grade, 3,612 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents