Similar Projects
Marina Parking Lot Project
Bidding
Isle of Palms, SC

Bay Creek Park Parking Lot Improvements
Post-Bid
$15,000 to $30,000 est. value
Edisto Island, SC 29438

CDBG Sidewalk Improvements
Post-Bid
North Charleston, SC 29419

On-Call Trip Hazard Repair-Chalreston
Term Contract
Results
SC

Orleans Road Sidewalk Installation TST
Results
Saint Andrews, SC 29407

Pedestrian Path - West 2nd Street
Post-Bid
Folly Beach, SC

On-Call Sidewalk Repair Clarendon Cty
Term Contract
Results
SC

IOP Connector to Palm Boulevard Sidewalk Installation
Results
North Charleston, SC

Zucker GEC Parking Lot - Resurface
Results
$103,318 est. value
North Charleston, SC 29634

St. Julian Devine Community Center Site Improvements
Results
Less than $399,557 est. value
Charleston, SC 29403

Northside Drive Sidewalk Project CTC
Results
North Charleston, SC 29405

Oakbrook Middle School Bus Parking Lot
Results
$150,000 to $250,000 est. value
Ladson, SC 29456

Kelly House Exterior Walkway Structural Repairs
Results
$685,000 to $835,000 est. value
Charleston, SC 29424

Beach Access Walkover Replacement
Results
Less than $34,160 est. value
Folly Beach, SC 29439

Building 401 Parking Lot Repaving
Results
Charleston, SC 29413

Last Updated 04/05/2021 12:22 AM
Project Title

Lighthouse Boulevard Sidewalk Project TST

Physical Address View project details and contacts
City, State (County) Charleston, SC 29412   (Charleston County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work shall consist of installation of approximately 700 feet of new variable width asphalt path and approximately 260 feet of new 5 foot wide concrete sidewalk along the west side of Lighthouse Boulevard (S-1149) from Fort Johnson Road (S-94) to Brigantine Drive (S-1484). The project shall also consist of installation of a drainage system along the east side of the road. The work shall include, but is not limited to, clearing, traffic control, sidewalk installation, drainage improvements, and erosion and sediment control.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents