Similar Projects
City Municipal Building Retaining Wall Replacement
Infrastructure
Bidding
Lone Tree, CO

Morton Heights Subdivision Paving, Drainage, and Sidewalk Improvements
Infrastructure
Bidding
Boulder, CO

Grand Junction Re Various Culverts
Post-Bid
$1,000,000 to $5,000,000 est. value

Grand Junction Re Various Culverts
Post-Bid
$1,000,000 to $5,000,000 est. value

Kahil Storm Drainage Project
Results
Less than $1,072,736 est. value
Fort Lupton, CO 80621

Groundwater Recharge Ponds Pilot Project
Results
Thornton, CO

Aspen Maintenance Facility Trench Drain Replacement
Term Contract
Bidding
Aspen, CO 81611

Robinson Ditch Modification Project
Post-Bid
Basalt, CO 81621

Quincy Intertie Improvements
Results
$7,400,000 to $8,400,000 est. value
Aurora, CO

Claremont Substation - Erosion Mitigation Construction
Infrastructure
Bidding
Colorado Springs, CO

Timnath Reservoir Shoreline Improvements
Post-Bid
Less than $500,000 est. value
Timnath, CO

15th Street and Lefthand Ditch Culvert Replacement
Results
Less than $1,000,000 est. value
Boulder, CO 80304

Copperleaf Water Quality Pond J Improvements
Post-Bid
$450,000 to $625,000 est. value
Aurora, CO

Anson Rudd House Exterior Drainage Improvements and Porch Rehabilitation
Results
Canon City, CO 81212

Irrigation Ditch
Post-Bid
Boulder, CO

Reported 02/26/2022 12:00 AM
Project Title

Z--CO-BACA NWR-Passage Ditch 9 &10

Physical Address View project details and contacts
City, State (County) Crestone, CO 81131   (Saguache County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This Project includes providing all labor, equipment, and materials to remove existing culverts and water control structures (WCS) at three road crossings, install three new culverts with steel headwalls and sheet pile wingwalls with water control structures, and install 350 feet of rocky fill for a engineered rock streambed that is to be maintained as fish habitat.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents