Similar Projects
Weigh-In-Motion Replacement Veterans Memorial Tollway I-355 Mile Post 2.2 (Bruce Road)
Infrastructure
Bidding
Downers Grove, IL

CERL - Farber Drive Entrance Extension
Infrastructure
Bidding

20-110 Hot-Mix Asphalt Surface Removal
Term Contract
Post-Bid
Wheaton, IL 60187

RR-16-4253 - CO#51 - ATP# 69.1 - I-88 Roadway and Bridge Rehabilitation
Post-Bid
Downers Grove, IL 60515

Gregory Avenue and Somerset Drive Reconstruction
Results
$1,081,025 est. value
Glendale Heights, IL 60139

2020 Wayne MET Road Program
Results
Less than $275,000 est. value
Wayne, IL 60184

Devon-Park-Pierce Intersection Improvements
Pending Verification
Itasca, IL 60143

2021 Pavement Patching
Infrastructure
Bidding
$73,000 est. value
Carol Stream, IL

Construction Variable Width Pav`R. Resurfacing W/ Hot-Mix Asphalt Surface
Post-Bid
Bensenville, IL

Mack Road Trail Extension at St. James Farm Forest Preserve
Results
Less than $357,500 est. value
Wheaton, IL 60189

2021 Roadway Paving Improvements Project
Infrastructure
Bidding
Addison, IL

Pavement Resurfacing
Post-Bid
Burr Ridge, IL

2020 GM Roads Program
Results
Downers Grove, IL 60187

2021 GM Roads Program
Infrastructure
Bidding
IL

2021 MFT Road Program
Post-Bid
Burr Ridge, IL

Last Updated 08/24/2021 10:02 AM
Project Title

Commerce Drive Reconstruction

Physical Address View project details and contacts
City, State (County) West Chicago, IL   (DuPage County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $780,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work as shown on the plans and as specified herein consists mainly of roadway reconstruction. The work is to be performed on Commerce Drive, located south off of Roosevelt Road (IL Route 38), in the City of West Chicago, Illinois. The project includes, but is not limited to, the following items: Hot-Mix-Asphalt pavement removal, earth excavation, installation of full-depth aggregate subgrade, Hot-Mix-Asphalt pavement, intermittent curb and gutter removal and replacement, utility structure frame adjustments, final restoration, and all incidental and collateral work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Excavation and Fill, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents