Similar Projects
Garage Addition and Concrete Work
Addition
Post-Bid
Arlington Heights, IL 60005

Ready Mix Concrete D7 Specific Counties
Term Contract
Post-Bid

Concrete at Birch Park
Results
Hoffman Estates, IL 60169

Housing Rehabilitation Program - Porch Reconstruction
Results
Rock Island, IL 61201

UIC Dumpster Pads
Renovation, Alteration
Post-Bid
Chicago, IL 60607

Concrete Marquee on Metro Way
Results
Swansea, IL

Construction Single Span Bridge
Renovation
Post-Bid
Marion, IL

El Paso Gridley #11 JHS - Early Precast Concrete
New Construction - 80,000 SF
Results
Gridley, IL 61744

Site Improvements at Goodenow Grove Nature Preserve and Plum Valley Preserve Dog Park
Alteration
Post-Bid
IL

Concrete at Bridges Driving Range
Results
Arlington Heights, IL

Ready Mix Concrete D2 Specific Counties
Infrastructure, Alteration
Post-Bid
Springfield, IL

2021 Miscellaneous Concrete Repairs
Results
$628,377 est. value
Morton, IL

Weir Concrete Repairs
Alteration
Post-Bid
IL

Ready-Mix Concrete And Corresponding Products
Results
Carbondale, IL

Replacing Building Floor With Concrete
Renovation
Post-Bid
Joliet, Manhattan, IL 60442

Last Updated 10/27/2022 07:32 PM
Project Title

Tri-State Tollway (I-294) Fiber Installation

Physical Address View project details and contacts
City, State (County) Downers Grove, IL 60515   (DuPage County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $70,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this contract includes installation of fiber optic cable, relocation of temporary ITS devices including cameras and bluetooth detection systems, removal of existing temporary fiber optic cable, and maintenance of traffic. The location of the services to be performed for this contract is the Tri-State Tollway (I-294) between Mile Post 23.8 and Mile Post 30.0 in Cook County, Illinois Questions pertaining to the intent of the contract documents may be sent to the Illinois Tollway, attention 4424D.4854_Questions@docs.e-builder.net, to be received no later than 2:00 p.m. local time on October 13, 2022. Tri-state Tollway (I-294) Fiber Installation Flagg Creek to Plaza 35 (Cermak Road Plaza) M.p. 23.8 to M.p. 30.0 1-21-4834

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents