Similar Projects
Spire Institute
Renovation - 750,000 SF
Conception
Geneva, OH 44041

TrailSide Village
New Construction - 284,730 SF
Conception
$150,000,000 est. value
Cincinnati, OH

Copious Multi-Use Development at High and Blenkner
New Construction, Demolition - 5,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Columbus, OH 43215

Flyghtwood
New Construction
Design
Trotwood, OH 45426

Planet Fitness / Mansfield
Renovation - 27,121 SF
Bidding
Mansfield, OH

Medina Grande Shops - Fitness Center
Renovation - 16,984 SF
Bidding
$1,200,000 est. value
Medina, OH

PHCA Educational and Fitness Center Addition
Addition
Post-Bid
Perrysburg, OH 43552

Community and Aquatic Center
New Construction
Post-Bid
$14,425,000 est. value
Mayfield Heights, OH

Fitness Room Mezzanine
New Construction, Build-Out - 575 SF
Results
$380,000 est. value
Kent, OH

New Wellness and Fitness Facility
New Construction - 14,750 SF
Results
$4,500,000 est. value
Lorain, OH

50 North Expansion
New Construction - 49,500 SF
Construction
$6,200,000 est. value
Findlay, OH 45839

Artistry One River Plaza
New Construction - 80,000 SF
Construction
$77,000,000 est. value
Cincinnati, OH 45202

SoulFuel Fitness
Renovation - 1,170 SF
Pending Verification
Worthington, OH 43085

Cleveland Sports Biomechanical Lab
Build-Out - 10,000 SF
Pending Verification
Cleveland, OH 44145

Fitness Center/Gym
Renovation - 2,530 SF
Conception
Columbus, OH 43215

Reported 07/23/2022 12:00 AM
Project Title

Planet Fitness

Physical Address View project details and contacts
City, State (County) Strongsville, OH 44136   (Cuyahoga County)
Category(s) Entertainment/Recreation
Sub-Category(s) Fitness Center
Contracting Method Owner to Subcontract by Invitation Only.
Project Status Bidding, Construction Start Expected August 2022,
Bids Due View project details and contacts
Estimated Value $1,200,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of removal of the existing black card spa area, removal of the existing restrooms, showers and locker rooms for the new construction of the same. The club will be open and there will be customers to work around. The removal of floor finishes requiring load machines, the removal of concrete, any saw cutting and anything else requiring large or load equipment will have to be performed after 10pm or before 6am. The project is anticipated to begin upon permit issuance which could be within 2 weeks of the bid due date, so please bid accordingly and take this into account.

Details

Fitness Center, 1 Story Above Grade, 15,205 SF Renovation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Specialty Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents