Similar Projects
Pavement Milling and Ultra-Thin Bonded Wearing Course
Bidding
Caribou, New Sweden, Woodland, ME

Asphalt Street Paving 2021
Bidding
Houlton, ME

Paving Project
Post-Bid
Mapleton, ME

Roads Grading/Street Sweeping/Heating
Post-Bid
Island Falls, ME

Hodgdon High School Paving Project
Results
Hodgden, ME 04730

Road Work on Sly Brook Road
Results
Eagle Lake, ME

Road Paving
Post-Bid
Saint Agatha, ME

Pavement Milling and Hot Mix Asphalt Overlay/Project is Located in Mars Hill on US Route 1 Beginning 0.01 Mile North of the US Route 1A Intersection and Extending North 1.57 Miles
Results
Less than $505,000 est. value
Mars Hill, ME 04758

Asphalt Street Paving 2020
Post-Bid
Houlton, ME

Crack Sealing
Results
ME

Paving of Three Streets
Post-Bid
Westfield, ME

Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements
Results
ME

Airport Crack Sealing/Repair Project
Post-Bid
Less than $23,500 est. value
Presque Isle, ME

Pavement Milling, Hot Mix Asphalt Overlay, and Ultra-Thin Bonded Wearing Course
Results
Blaine, Bridgewater, Caribou, Monticello, ME 04734

2021-2022 Town Paving Projects
Term Contract
Post-Bid
Madawaska, ME

Last Updated 03/11/2021 02:50 AM
Project Title

Crack Sealing

Physical Address View project details and contacts
City, State (County) Eagle Lake, New Sweden, Stockholm, Wall Grass, ME   (Aroostook County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $107,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Location: In Aroostook County, Priority I is located On Route 11 beginning in Eagle Lake 2.31 miles south of Gilmore Brook Road and extending northerly 3.00 miles to Wallagrass. Priority 2 is located on Route 161 beginning in T17R5 (Cross Lake TWP), 0.57 miles north of the TI7-R5 town line and extending northwesterly 4.88 miles to a point 0.31 of a mile north of the Ouellette Road. Priority 3 is located on Route 161 beginning in New Sweden 0.08 miles south of Station Road and extending northwesterly 9.42 miles to Madawaska Lake TWP.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents