Similar Projects
Norarrow Multifamily Housing
New Construction, Infrastructure - 270,880 SF
Conception
$80,000,000 CJ est. value
Fort Wayne, IN 46845

Project Green
New Construction, Infrastructure - 673,000 SF
Conception
$361,000,000 CJ est. value
Fort Wayne, IN 46809

Tiburon/Livingston Lakes Extended
New Construction, Infrastructure
Design
Fort Wayne, IN 46818

Hunters Development
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fort Wayne, IN 46845

Three Rivers Horse Trails and Trailhead
Infrastructure
Bidding
$750,000 CJ est. value
Fort Wayne, IN 46816

Place Seal Coat on Parking Lots
Infrastructure
Bidding
$100,000 CJ est. value
Fort Wayne, IN 46805

On-Call Construction Services
Infrastructure
Post-Bid
Fort Wayne, IN

FWCS Wayne HS - Bid Package 2 Building and Sitework
Renovation, Infrastructure - 318,613 SF
Post-Bid
$46,000,000 est. value
Fort Wayne, IN 46895

Demolition and Lot Restoration for Neighborhood Code
Infrastructure
Results
Fort Wayne, IN

Headwaters Lot Excavation and Remediation
Infrastructure
Results
Fort Wayne, IN 46802

Isabelle Gardens
New Construction, Infrastructure
Construction
$5,000,000 CJ est. value
Fort Wayne, IN 46805

RFP Design Architectural and Engineering Services for the Expansion and Renovation of Levan R. Scott Academy
Addition, Renovation, Infrastructure
Pending Verification
$670,000 CJ est. value
Fort Wayne, IN 46806

Roosevelt Pointe
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Fort Wayne, IN 46816

Murphy #6931 / Ft. Wayne
Demolition, New Construction, Infrastructure - 2,800 SF
Conception
$1,500,000 CJ est. value
Fort Wayne, IN 46802

Premier Riverfront Property
New Construction, Infrastructure - 60,000 SF
Design
$70,000,000 CJ est. value
Fort Wayne, IN 46802

Last Updated 04/06/2023 05:09 PM
Project Title

Three Rivers Filtration Plant MCC-S/S1 Replacement 2023

Physical Address View project details and contacts
City, State (County) Fort Wayne, IN 46802   (Allen County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $116,724 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project shall consist of replacing the existing MCC-S/S1, located in the Plnat #2 Control House at the Water Filtration Plant. EBE goal for THIS PROJECT is 10% of the Contract Price

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents